Liwei Group Co., Ltd

Products

MasterFiber 343 - blend of engineered synthetic macro and microfibre

    • Product Name: MasterFiber 343 - blend of engineered synthetic macro and microfibre
    • Factroy Site: West Ujimqin Banner, Xilingol League, Inner Mongolia, China
    • Price Inquiry: sales1@liwei-chem.com
    • Manufacturer: Liwei Group Co., Ltd
    • CONTACT NOW
    VTB
    Specifications
    HS Code 454967
    Product Type Blend of engineered synthetic macro and micro fibers
    Composition 100% virgin polypropylene
    Form Fibrillated macro fibers and monofilament micro fibers
    Color Gray
    Density 0.91 g/cm³
    Macro Fiber Length 50 mm
    Micro Fiber Length 6 mm
    Macro Fiber Diameter 0.8 mm
    Micro Fiber Diameter 0.02 mm
    Macro Fiber Aspect Ratio 62.5
    Micro Fiber Aspect Ratio 300
    Macro Fiber Tensile Strength 500 MPa
    Micro Fiber Tensile Strength 400 MPa
    Young S Modulus 8 GPa
    Melting Point 165 °C
    Water Absorption <0.1%
    Alkali Resistance Excellent
    Acid Resistance Excellent
    Salt Resistance Excellent
    Dosage Rate 3 - 6 kg/m³
    Packaging 10 kg bags
    Shelf Life 2 years
    Standards Compliance ASTM C1116 Type III, EN 14889-2 Class I

    As an accredited MasterFiber 343 - blend of engineered synthetic macro and microfibre factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.

    Packing & Storage
    Packing MasterFiber 343 macro/microfibre blend supplied in 20 kg moisture-resistant bags, palletized and shrink-wrapped for storage and handling.
    Container Loading (20′ FCL) 20′ FCL container loaded with MasterFiber 343, a blend of engineered synthetic macro and microfibre, palletized and secured for shipment.
    Shipping MasterFiber 343 ships as a non-hazardous material, not classified as dangerous goods. It is typically supplied in moisture-resistant bags on shrink-wrapped pallets. Transport in clean, dry, covered vehicles at ambient temperature. Keep packaging closed and intact; avoid moisture, punctures, and excessive compression. No special ventilation required.
    Storage Store MasterFiber 343 in its original, sealed packaging in a dry, cool, well-ventilated warehouse. Protect from moisture, humidity, direct sunlight, heat, sparks, flames, and incompatible chemicals. Keep containers closed, off the floor on pallets. Avoid generating dust and damaging bags. Follow SDS, local regulations, and first-in, first-out stock rotation. Use appropriate PPE during handling; no smoking or open flames.
    Shelf Life MasterFiber 343 shelf life: indefinite when stored in original unopened packaging, dry, protected from moisture, direct sunlight, and extreme temperatures.
    Application of MasterFiber 343 - blend of engineered synthetic macro and microfibre

    When Wet-Mix Shotcrete Rebound Exceeds 22% on Site, Fibre Type and Addition Point Become Controlling

    In wet-mix shotcrete for underground headings, MasterFiber 343 addition occurs at the batching plant through a calibrated fibre dosing hopper that discharges into the twin-shaft compulsory mixer after coarse aggregate and before water. The macro fibre fraction, commonly 38–54 mm in length with an equivalent diameter of 0.6–0.9 mm, contributes post-crack flexural toughness required for rock support. The micro fibre fraction, typically 10–20 mm in length, reduces early plastic shrinkage and improves material cohesion at the nozzle. A representative dosage window is 3.0–6.0 kg/m³, but the actual addition rate is set by the specified residual flexural strength class under EN 14488-3:2006. For temporary support, an fR1k value of not less than 2.0 MPa is often specified; for permanent linings, fR4k of not less than 1.5 MPa may be required. Delivery through a swing-tube piston pump with a 50 mm internal diameter hose produces line pressures from 18–28 bar at outputs of 12–16 m³/h. Sharp 90° bends and reducer transitions increase the probability of fibre accumulation and should be avoided. Air supply at the nozzle is typically 4–8 m³/min at 0.5–0.7 MPa. At the crown, rebound can exceed 22% when fibre dosage is high and accelerator dosage is insufficient; accelerator dosage is adjusted in increments of 0.2–0.5% by cement mass. Field verification requires trial panels sprayed with the production equipment, then beam specimens sawn and tested under EN 14488-3. Fibre distribution is improved by using a swivel-type nozzle and a well-regulated air ring rather than extended travelling distances. Batch-to-batch variation in fibre count per unit volume should be checked by washout testing of fresh concrete per ACI 506R guidance. If the fibre feed skips during the shift, residual strength in the corresponding advance should be treated as non-compliant until companion panel testing demonstrates otherwise.

    For carousel production of precast concrete segments, the dosing sequence for MasterFiber 343 begins with dry mixing for 60–90 s in a twin-shaft compulsory mixer, followed by wet mixing for 90–120 s after water and superplasticiser are introduced. The addition rate is generally specified between 2.5–4.5 kg/m³, with the lower end for segments with dense conventional reinforcement and the upper end for segments requiring improved handling toughness after stripping. The macro fibre fraction acts at demoulding and during lifting by vacuum handling systems; the micro fibre fraction reduces the incidence of edge spalling at mould corners. Steam curing is conducted at 55–80°C for 6–10 h, with ramp rates limited to 15°C/h to avoid thermal shock. Synthetic fibres must retain their geometry through the heating cycle. Published multi-batch field data specific to MasterFiber 343 under segment curing is limited; therefore a plant trial of at least three consecutive batches is required to establish fibre distribution and surface finish stability. Flexural performance is evaluated according to ASTM C1609/C1609M-19a, and residual strength is additionally measured by ASTM C1399/C1399M-10(2015). Compressive strength is verified under EN 12390-3. Visual inspection after demoulding includes checking for clustering at steel mould edges, which is aggravated by over-vibration above 70 Hz. Edge trowelling should be limited because manual working can draw macro fibres to the formed surface. Fibre addition does not replace conventional reinforcement required for bursting, handling, or segment erection loads. If the mix self-compacts on a carousel without external vibration, the slump flow must be controlled to avoid fibre segregation.

    Jointless Slab-on-Grade Flooring Demands More Than Crack Width Control

    The governing conflict in jointless slab-on-grade construction is the simultaneous requirement for extended joint spacing and acceptable post-crack residual strength under forklift and racking loads. MasterFiber 343 is added at 2.0–5.0 kg/m³. The macro fibre fraction bridges cracks that form at construction joints or saw-cut terminations; the micro fibre fraction controls plastic settlement and surface craze cracking during laser screed finishing. Flexural performance is measured under ASTM C1609/C1609M-19a using 150 x 150 x 500 mm beams loaded at third points. For industrial floors, a performance target of R3 30–50% or residual strength at L/600 of 1.5–2.5 MPa is commonly specified, depending on racking loads. The fibre blend does not eliminate differential drying shrinkage; the water-cement ratio should remain between 0.45–0.50, and wet curing for 7 days is required. If the concrete is pumped through a 36 m boom with a reducer from 125 mm to 100 mm, localised fibre blockages can occur at reducers when the bend radius is less than 1.0 m. Plant dosing must be automated with a tolerance of ±0.5 kg per load to limit variation in flexural toughness across the pour. After strike-off, the use of a laser screed followed by a pan float must be sequenced before the surface crust closes. A skip float applied too late can draw macro fibres to the surface and create visible fuzz. For high-rack warehouses, the test programme also includes ASTM C1581/C1581M-18a restrained shrinkage ring testing to compare crack initiation time. Slab curling is governed by moisture differentials and is not corrected by fibre addition alone.

    Downstream sectorRepresentative addition windowGoverning test methodTypical performance parameter
    Wet-mix shotcrete3.0–6.0 kg/m³EN 14488-3:2006fR1k ≥ 2.0 MPa
    Precast concrete segments2.5–4.5 kg/m³ASTM C1609/C1609M-19aResidual strength at L/600 1.0–2.5 MPa
    Jointless slab-on-grade2.0–5.0 kg/m³ASTM C1609/C1609M-19aR3 30–50%
    Dry-cast pipe2.0–4.0 kg/m³EN 1916 / ASTM C76Three-edge bearing class compliance
    Rigid pavement / white topping1.8–4.0 kg/m³ASTM C1609/C1609M-19aResidual strength at L/600 1.0–2.0 MPa
    Repair overlay1.5–2.5 kg/m³ASTM C1583/C1583M-13Bond strength ≥ 1.0 MPa

    Dry-cast pipe manufacturing operates with zero-slump concrete compacted by vibratory action at 40–60 Hz. MasterFiber 343 is added at 2.0–4.0 kg/m³. The micro fibre fraction is more relevant for surface tearing at immediate demoulding; the macro fibre fraction improves handling resistance after the pipe is stripped and moved to curing racks. Fibre balling in dry mixes is a known process failure when water is added before fibres or when mixer pan liners are excessively worn. The standard governing polymer fibres for concrete is EN 14889-2:2006; it requires geometric consistency and defines compliance for relevant material properties. No fully published stress-strain data for MasterFiber 343 in dry-cast zero-slump concrete appears in open literature; validation therefore requires a full-scale trial pipe. Three-edge bearing strength is evaluated according to EN 1916 or ASTM C76. Visual acceptance after demoulding includes checking for fibre clusters at the spigot and bell ends. If clusters are present, the addition sequence must be changed or the mixing time extended. Conventional reinforcement remains mandatory for large-diameter classes where specified. Surface finish on the inner shell is verified immediately after demoulding under task lighting. The fibre blend does not act as a replacement for structural steel cages in high-load pipe classes; its primary function is crack control and handling toughness.

    Does Synthetic Macro Fibre Survive the Steam Curing Cycle in Precast Facade Elements?

    When MasterFiber 343 is specified in architectural wall panels produced on long-line steel tables, the primary thermal concern is not fibre degradation but fibre read-through and surface blemish after steam curing. The addition rate is typically 1.5–3.0 kg/m³. Synthetic macro fibres have a specific gravity near 0.90–0.96; in wet mixes with a water-cement ratio above 0.45, fibre migration to the top surface becomes likely during vibration and trowelling. The macro fibre fraction improves handling strength after demoulding; the micro fibre fraction reduces plastic cracking at edges and returns. Curing is controlled with a ramp rate of 10–15°C/h and a maximum holding temperature of 80°C. Compliance with fibre specification is assessed under EN 14889-2:2006 and ASTM C1116/C1116M-23. Flexural performance is measured on companion specimens under ASTM C1609/C1609M-19a. Visual acceptance follows the project-specific architectural precast tolerance, and a minimum cover of 15–20 mm over the fibre-reinforced zone is maintained to prevent exposed fibre at the mould surface. Surface retarders and acid etching cannot remove exposed macro fibres after curing. The fibre blend does not replace steel connection reinforcement, edge trims, or structural wythe connectors in insulated sandwich panels. If polishing or sandblasting is specified, a full-scale mockup panel is required to evaluate fibre visibility before production. Batch-to-batch variability in fibre length distribution should be checked against the supplier certificate.

    Under slipform paving conditions, the specified addition rate for MasterFiber 343 in rigid pavement and bonded white topping ranges from 1.8–4.0 kg/m³. Total air content is maintained at 5.5–7.5% by volume under ASTM C231 because synthetic fibres do not provide freeze-thaw resistance. The macro fibre fraction reduces crack opening under traffic-induced flexural stress; the micro fibre fraction reduces plastic shrinkage cracking during hot, windy placement. Flexural performance is evaluated by ASTM C1609/C1609M-19a; for white topping, residual strength at L/600 of 1.0–2.0 MPa is often specified. Joint layout is still governed by pavement thickness, support conditions, and curling stress analysis. Fibre addition may allow modest increases in joint spacing only if supported by structural analysis and a site trial panel. Texturing operations with burlap drag or tining must be completed before the surface crust closes; late tining can expose fibres at the pavement surface. If a slipform paver with slab width 7.5–9.0 m is used, fibre clumps at the auger can cause longitudinal streaks; paver speed and auger speed must be tuned during trial placement. The use of an internal vibrator array with 6,000–10,000 vpm may locally redistribute fibres; spacing of vibrators must not exceed 1.5 times the radius of influence. For airfield pavement, the more stringent flexural strength and surface friction standards apply, and fibre addition does not replace dowels or tie bars at joints.

    Bond Line Compatibility in Fibre-Reinforced Concrete Overlays

    Bonded concrete overlay placement begins with surface preparation to ICRI 310.2R CSP 6–9. MasterFiber 343 is added at 1.5–2.5 kg/m³ for crack control in cementitious overlays. The macro fibre cannot compensate for a contaminated bond line; laitance, oil, and dust must be removed before placement. The micro fibre fraction reduces plastic cracking at the surface during hot weather and high evaporation conditions. Bond strength is tested by ASTM C1583/C1583M-13 and must exceed 1.0 MPa at 28 days. Shrinkage is measured under ASTM C157/C157M-17; the fibre blend reduces visible crack pattern but does not alter chemical drying shrinkage of the cement paste. Application thicknesses below 25 mm may expose macro fibres after trowelling; therefore the maximum fibre length should be less than one-third of the overlay thickness. Pumping through small-line pumps with 25 mm or 32 mm hoses is possible but requires pre-wetted fibres and a mixer uniformity check. The overlay system must comply with ASTM C928/C928M-20 or the specified repair material standard. The presence of synthetic fibres does not reduce the need for a saturated surface-dry substrate and an appropriate bonding agent. If the overlay is placed on a substrate with high suction, a scratch coat or pre-wetting is required to prevent rapid water loss at the bond line.

    Free Quote

    Competitive MasterFiber 343 - blend of engineered synthetic macro and microfibre prices that fit your budget—flexible terms and customized quotes for every order.

    For samples, pricing, or more information, please contact us at +8618112911328 or mail to sales1@liwei-chem.com.

    We will respond to you as soon as possible.

    Tel: +8618112911328

    Email: sales1@liwei-chem.com

    Inquiry

    Get Free Quote of Liwei Group Co., Ltd

    Flexible payment, competitive price, premium service - Inquire now!

    Certification & Compliance
    More Introduction

    MasterFiber 343 is a dry, non-corrodible blend of engineered synthetic macrofibre and microfibre supplied under the BASF Master Builders Solutions portfolio. The product is batched into concrete at addition rates commonly between 1.5 kg/m³ and 4.5 kg/m³; the lower band is selected when ASTM C1579-21 plastic-shrinkage crack control is the primary acceptance criterion, and the upper band is selected when ASTM C1609/C1609M post-crack residual flexural performance must be demonstrated. The dimensional boundary between the fibre classes follows EN 14889-2:2006, with polymer fibres below 0.30 mm diameter treated as Class I microfibres and fibres at or above 0.30 mm diameter treated as Class II macrofibres. The synthetic system has a specific gravity below 1.0, in contrast to steel fibre at approximately 7.85, and does not introduce chloride-induced corrosion risk in concrete exposed to ISO 9223 atmospheric corrosivity categories C2 and higher.

    What mechanisms distinguish blended macro- and microfibre contributions in plastic and hardened concrete?

    In the plastic-state phase, the microfibre fraction interrupts bleed-channel percolation and redistributes capillary stress before the first crack. ASTM C1579-21 evaluates restrained plastic shrinkage under induced evaporation, and the microfibre network reduces crack area by increasing early-age tensile strain capacity. The macrofibre fraction remains largely inactive until the cementitious matrix has stiffened and crack planes begin to develop. Hardened-state performance is governed by the macrofibre fraction, which provides load transfer across crack faces after first crack. Flexural performance is quantified under ASTM C1609/C1609M using third-point loaded beams, while equivalent residual strength can be assessed under ASTM C1399/C1399M. The post-crack behaviour depends on fibre aspect ratio, anchorage geometry, modulus, and count per unit volume. Fibre conformance falls under ASTM C1116/C1116M Type III for synthetic fibre-reinforced concrete, with EN 14889-2:2006 applicable to the polymer fibre fractions.

    Published data for this specific configuration is limited regarding exact residual strength values at arbitrary deflection ratios; project acceptance therefore requires preconstruction beam testing at the specified fibre dosage and concrete mixture design. The microfibre and macrofibre components do not act as a simple additive system because the microfibres alter the early-age paste microcracking pattern, which then changes the crack spacing and crack widths inherited by the macrofibre network.

    On a production-scale twin-shaft compulsory mixer, delayed addition after 70% to 80% of batch water is charged is generally specified to limit macrofibre balling at mixer blades. Fibre bags should be discharged over 15 to 30 seconds with the mixer operating at full batch speed. Dispersion is checked by wash-out sampling on the first 0.5 m³ of discharge. Truck-mixed loads require not less than 5 minutes of mixing at 15 rpm after fibre addition under ASTM C94/C94M-23 and EN 206:2013+A2:2021 uniformity requirements. In a 2.0 m³ pan mixer, addition too early in a low-mobility mixture has produced observable macrofibre interlocking at paddle arms; moving the addition point later in the batching sequence eliminated the condition without requiring additional water.

    Wet-mix shotcrete practice benefits from the blended synthetic fibre through reduced rebound of the macrofibre fraction while the microfibre fraction stabilises the fresh sprayed layer. ACI 506R-16 provides application-classification guidance for such fibre-reinforced shotcrete. Pumping through a 50 mm line is typically feasible when the fibre is fully dispersed, with no sectional blockages reported in mixture designs within the 1.5 to 4.5 kg/m³ dosage envelope. Finishability is dosage-dependent; at higher addition rates, macrofibres may protrude under aggressive early troweling, and finishing crews should delay final troweling until the surface paste has stiffened sufficiently to close fibre tracks.

    Comparative Positioning Against Single-Phase Macro- and Microfibre Systems

    MasterFiber 343 differs from single-phase microfibre and single-phase macrofibre products in that the microfibre fraction addresses plastic-shrinkage cracking, while the macrofibre fraction supplies post-crack residual capacity. A single-phase microfibre at 0.6 to 1.2 kg/m³ provides plastic-shrinkage control but does not meaningfully improve post-crack flexural behaviour. A single-phase synthetic macrofibre at 3.0 to 6.0 kg/m³ improves residual strength but may leave plastic-settlement and early-age microcracking insufficiently controlled. The blended system is specified where both performance modes are required in one addition line.

    Comparative properties relevant to specifying blended synthetic fibre versus single-phase fibre or steel fibre
    PropertyMasterFiber 343 blended syntheticSingle-phase microfibreSingle-phase macrofibreSteel fibre
    Plastic-shrinkage crack controlHigh via microfibre fractionHighLow to moderateLow
    Post-crack residual flexural capacityModerate to high via macrofibre fractionLowHighHigh
    Corrosion susceptibility in chloride environmentNot chloride-corrodibleNot chloride-corrodibleNot chloride-corrodibleProne to surface corrosion unless stainless or galvanised
    Added dead loadLow; specific gravity below 1.0LowLowHigh; specific gravity near 7.85
    Practical dosage band1.5 to 4.5 kg/m³0.6 to 1.2 kg/m³3.0 to 6.0 kg/m³15 to 40 kg/m³
    Primary conformanceASTM C1116/C1116M Type III; EN 14889-2:2006ASTM C1116/C1116M Type III; EN 14889-2:2006 Class IASTM C1116/C1116M Type III; EN 14889-2:2006 Class IIASTM C1116/C1116M Type I; ISO 13270:2013

    In chloride-exposed slabs, the absence of steel-fibre surface corrosion is a differentiating factor. Under ISO 9223 corrosivity classifications C2 and higher, carbon-steel fibre can produce surface staining and reduced aesthetics unless encasement is complete. The polymer fibre system does not require such encasement. Against glass-fibre products, the synthetic polyolefin-based system offers stable alkali resistance in the high-pH cementitious pore solution, which is evaluated under the alkaline-ageing provisions of EN 14889-2:2006. Alkali resistance is not a limiting property for the synthetic fibre classes represented in MasterFiber 343.

    Handling differences also affect plant selection. Steel fibre dosing frequently requires magnetic transfer and wear-protected mixer liners because of abrasive action on twin-shaft and planetary mixers. MasterFiber 343 is gravity-fed or bag-added without magnetic equipment and does not require hardened mixer wear plates as a fibre-specific modification. Published data for comparative abrasive wear of mixing blades under polymer-fibre addition is limited, but production experience indicates no incremental wear beyond the normal aggregate mix.

    For slab-on-ground applications, MasterFiber 343 is introduced where both early-age cracking resistance and post-crack toughness are stated in the project specification. ACI 360R-10 governs slab design and jointing; the fibre system does not remove saw-cut joint requirements. Joint spacing is still determined by slab thickness, subgrade restraint, shrinkage potential, and loading. Fibre addition can reduce crack width at restrained contraction joints, but the panel layout must remain based on the structural design and curing programme. ACI 308.1 and ASTM C171 curing requirements apply unchanged. Preconstruction mock-ups placed under production temperature, slump, and finishing conditions should be used to confirm surface finish and fibre distribution before the first pour.

    When Welded Wire Mesh Is Replaced by MasterFiber 343 in Slab-on-Grade Construction

    Replacement of welded wire mesh by MasterFiber 343 is performed when the design basis shifts from a discrete reinforcement cage to distributed fibre reinforcement. The fibre blend is dispersed through the full concrete depth, eliminating the placement tolerance problem associated with wire mesh located below the slab mid-depth. ACI 360R-10 and ACI 544.3R-07 provide design guidance for fibre-reinforced slabs. The synthetic fibre does not require chairs, laps, or cutting, and it does not present a tripping or puncture hazard during placement. The macrofibre fraction is intended to provide post-crack load transfer at saw-cut joints and in restrained shrinkage regimes, while the microfibre fraction limits early-age plastic cracking before joint sawing.

    Production-scale slab pours with MasterFiber 343 use the same laser-screed and walk-behind trowel equipment as conventional slabs, provided the dosage is controlled and the fibre is fully dispersed. If a laser screed places the concrete, fibre dispersion must be verified before placement because agglomerated macrofibres can drag under the screed rail and produce surface tears. Field observations on slabs placed at 1.8 to 3.0 kg/m³ show that early plastic-shrinkage cracks are reduced when evaporation exceeds 0.25 kg/m²/h, though the product is not a substitute for windbreaks, fogging, or evaporation retarders under ASTM C1579-21 exposure conditions. The product does not replace curing membranes; curing still controls surface moisture loss and strength development.

    For precast and composite metal deck placements, the blended fibre is added where distributed crack control and impact resistance are required without the dimensional interference of mesh or rebar. In thin composite deck slabs, the product permits placement without lifting mesh to the correct cover depth, which is a known bottleneck on elevated deck pours. ACI 544.3R-07 and the project specification define the accepted residual strength class. When the deck slab is designed as a structurally continuous composite member, the fibre contribution is limited to secondary crack control unless finite-element or test-based qualification demonstrates otherwise. Published data for this specific configuration is limited in high-end punching shear or severe seismic applications; the fibre system is not designated as a direct substitute for structural reinforcing bars where yielding reinforcement is required.

    Operational boundaries include a maximum practical dosage governed by workability and finishability rather than fibre chemistry. At addition rates above 4.5 kg/m³, slump may decrease and paste demand may increase. Water adjustment to restore slump must not violate the specified maximum water-cement ratio under EN 206:2013+A2:2021. The fibre should not be used as a reason to reduce specified cover or curing. A pre-drying requirement is not applicable to the fibre packaging under normal storage conditions, but bags should be protected from prolonged moisture exposure to avoid clumping. Incompatibility with air-entraining admixtures is not reported, but the effect of high-range water-reducing admixtures on fibre dispersion should be confirmed during preconstruction mock-up testing.