| HS Code | 780109 |
| Product Type | Macro Synthetic and Micro Synthetic Fiber |
| Fiber Composition | Blend of macro synthetic and micro synthetic fibers |
| Base Material | Polypropylene |
| Fiber Length | Macro: 51 mm; Micro: 19 mm |
| Fiber Form | Macro: fibrillated; Micro: monofilament |
| Specific Gravity | 0.91 |
| Tensile Strength | Macro: 600 MPa; Micro: 350 MPa |
| Elastic Modulus | Macro: 9 GPa; Micro: 3 GPa |
| Melting Point | 160 °C |
| Alkali Resistance | Excellent |
| Water Absorption | Nil |
| Typical Dosage | 4.5 kg/m³ (7.5 lb/yd³) |
| Packaging | 20 lb (9.1 kg) bags |
| Standards Compliance | ASTM C1116 Type III, ASTM C1399, ASTM C1609, EN 14889-2 |
| Color | Gray |
As an accredited SikaFiber Novomesh CAL-51 (Novomesh CAL-51) - Macro Synthetic and Micro Synthetic Fiber factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.
| Packing | SikaFiber Novomesh CAL-51 is supplied in 1.5 lb (0.68 kg) moisture-resistant bags, 48 bags per carton. |
| Container Loading (20′ FCL) | 20′ FCL container loading for SikaFiber Novomesh CAL-51 macro and micro synthetic fiber, palletized, moisture-protected, and securely stacked for transport. |
| Shipping | SikaFiber Novomesh CAL-51 is a non-hazardous macro/micro synthetic fiber blend. It is not regulated for transportation under DOT, ADR, IMDG, or IATA; no UN number, hazard class, placards, or special permits required. Ship in original sealed bags or pails, palletized, in dry, ventilated conditions, protected from moisture and sunlight. |
| Storage | Store SikaFiber Novomesh CAL-51 indoors in a cool, dry, well-ventilated area, away from direct sunlight, moisture, heat, and ignition sources. Keep original packaging sealed, clean, and undamaged, palletized off the floor. Protect from UV exposure, crushing, and contamination. Maintain recommended temperatures, typically 5–30°C, observe shelf life, and use first-in, first-out stock rotation. Follow local regulations and SDS guidance. |
| Shelf Life | 24 months from production when stored dry in original unopened packaging, protected from moisture and direct sunlight. |
In precast tunnel segment production, SikaFiber Novomesh CAL-51 is batched into a C50/60 high-performance concrete matrix where the structural role of the macro-synthetic fraction is controlled by residual flexural performance rather than direct tensile substitution for steel bar. Conformity for the fibre blend is assessed under EN 14889-2:2006, and the host concrete is specified to EN 13369 with reference to EN 1992-1-1 for mechanical design and to EN 12390-8 for water penetration depth. The batching window established on a planetary countercurrent mixer with 1.5 m³ batch volume is 2.5 kg/m³ to 3.6 kg/m³ for the macro-synthetic component, while the micro-synthetic fraction is introduced as part of the pre-blend at 0.6 kg/m³ to 0.9 kg/m³. Fibre addition occurs after the aggregate and cement have been pre-mixed for 60 seconds, and the mixing time after fibre introduction is held at 240 seconds at high rotor speed. Extended mixing beyond 360 seconds is not recommended because residual strength variability increases once fibre distribution has reached saturation and further shear work can disturb aggregate coating uniformity.
On a segment carousel line, the concrete is discharged into steel segment moulds at a flow class of S3 to S4, and external high-frequency vibrators operating at 50–60 Hz are applied in 8–12 second cycles to prevent macro-fibre settlement near vertical joint surfaces. The production bottleneck is not batching but demoulding: thin-walled segments with return edges require a minimum curing temperature of 55°C and a controlled ramp-down of 10°C/hour before mould stripping at 16–18 hours. Batch-to-batch variance in post-crack residual capacity measured by EN 14651 is typically below 0.4 MPa when the same aggregate source and cement fineness are maintained. Terminal products supplied from this process include TBM tunnel lining rings, shaft lining segments, culvert invert segments, and segmental retaining wall blocks. The macro-synthetic fibre does not replace circumferential reinforcement in thrust zones, but it reduces demoulding spalling and edge breakage that would otherwise require hand repair and secondary curing.
Ready-mix batches supplied to a large-format jointless floor placement are dosed between 2.0 kg/m³ and 4.5 kg/m³ for the macro-synthetic fraction, with the micro-synthetic component maintained at 0.6 kg/m³ to 0.9 kg/m³ for early-age plastic shrinkage control. The relevant compliance framework includes ASTM C1116/C1116M for fibre-reinforced concrete classification, ACI 302.1R-15 for floor slab construction tolerances, and Concrete Society TR34 for industrial ground floor design. Slab mixes are designed with a maximum aggregate size of 20 mm and a target slump of 120–160 mm at discharge, because macro-synthetic fibre addition depresses slump by approximately 20–30 mm at the upper dosage band and requires a polycarboxylate-based high-range water reducer adjustment of 0.4–0.8 L/m³ to restore pumpability. Dispersion is verified visually at the hopper: fibre balling at doses above 4.0 kg/m³ occurs when the load is discharged into a truck mixer at low revolution speed, and the mitigation is to add the fibre bales over 60–90 seconds into fresh mix during high-speed charging.
Placement is performed with a large-format laser screed that maintains a floor flatness of FM 3 to FM 4 under TR34 and a profile tolerance of ±3 mm over 2 m. After laser screeding, the section is finished with ride-on power trowels operated at pan speeds below 80 RPM during the first two passes; excessive burnishing before the surface has stiffened causes fibre extraction and creates micro-channels that increase surface porosity. Joint cutting is performed at 12–18 hours after final set depending on ambient temperature, and joint spacing is limited to 6–7 m unless steel or mixed reinforcement is present. The macro-synthetic fibre provides restraint against curling and crack width control under racking loads, but it is not a replacement for dowel load transfer at movement joints in slabs subject to high-speed forklift traffic. Terminal products include automated warehouse slabs, cross-dock logistics centres, pharmaceutical distribution floors, and air-cargo apron pavements. The operational boundary is that floors carrying high-intensity static racking legs above 800 kN per frame require separate structural reinforcement or thickened pile caps because post-crack residual capacity alone is insufficient for load redistribution.
Wet-mix sprayed concrete for underground galleries places an upper limit on aggregate size at 8 mm and requires a high paste volume to transport the macro-synthetic fibre through a piston pump and reduce rebound. The fibre blend is specified under EN 14889-2:2006 and the sprayed concrete material under EN 14487-1, while panel energy absorption is evaluated using EN 14488-5 and the residual flexural response is measured by EN 14651. The macro-synthetic fraction is batched at 4.0 kg/m³ to 6.0 kg/m³, and the micro-synthetic fraction is increased to 0.9 kg/m³ to 1.2 kg/m³ where flash setting and early-age cracking are observed in high-temperature underground environments. The pumping system is a wet-mix shotcrete piston pump with an air supply of 5–7 m³/min at the nozzle, and accelerator dosing is set between 3% and 5% by mass of cement. If accelerator dosage exceeds 6%, the fibre network loses post-crack tensile engagement because the matrix becomes too brittle before macro-fibre pull-out can develop, and the energy absorption class drops below specification.
The following table defines the typical batching and acceptance criteria for wet-mix shotcrete with synthetic polymer fibre conforming to EN 14889-2:2006:
| Energy class to EN 14488-5 | Macro-synthetic fibre addition | Forced-action mixing duration | Acceptance criterion |
|---|---|---|---|
| E500 | 3.0–3.9 kg/m³ | 4 min at high shear | No visible fibre balling; slump retention at 160–180 mm |
| E700 | 4.0–5.0 kg/m³ | 5 min at high shear | Panel energy absorption not less than 700 J at 25 mm deflection |
| E1000 | 5.0–6.0 kg/m³ | 6 min at high shear | Residual flexural strength ratio by EN 14651 above 0.35 at CMOD 3.5 mm |
Spray application in mine drifts and access galleries is performed with a nozzle distance of 1.0–1.5 m from the substrate, and the application angle is held at 80–90° to the rock face. Rebound increases sharply when the nozzle angle falls below 70°, and the macro-synthetic fibre rebound fraction is higher than the paste rebound fraction under such conditions. The finished lining is built up in 50–100 mm passes, with the first pass limited to 50 mm to avoid sagging and delayed detachment. Terminal products include exhaust shaft linings, mine drift support shells, tunnel portal rockfall barriers, and sprayed concrete saddles in box culvert repairs. Published data for shotcrete linings subjected to repeated blasting vibration are limited, but the operational boundary is that the macro-synthetic fibre contributes to toughness and crack distribution, not to the structural capacity of a heavily reinforced permanent lining under eccentric thrust.
Where canal lining sections are cast against vertical slipform sidewalls, the concrete is delivered at a consistency class of S2 to S3 because the macro-synthetic fibre fraction increases internal friction during slipform paving and a wetter mix causes edge slump. The fibre blend is compliant with EN 14889-2:2006, and the hydraulic concrete is specified under EN 206 with water penetration resistance tested according to EN 12390-8. Addition rates for the macro-synthetic component range from 2.0 kg/m³ to 3.0 kg/m³, while the micro-synthetic fraction is kept at 0.5–0.7 kg/m³. The mixer is a twin-shaft compulsory unit with a sequence of 25 seconds dry mixing after aggregate and cement charging, followed by water addition and a final fibre addition phase of 45–60 seconds during which the mixer gate is partially closed to reduce fibre loss. Batch operators note that the main process conflict is not dispersion but discharge time: macro-synthetic fibres increase the discharge time by 20–30% compared with plain concrete when the mixer gate is not fully opened.
The slipform paver is operated at advancing speeds between 0.8 m/min and 1.4 m/min, and internal immersion vibrators are set below 9000 vibrations/min to avoid bringing the macro-synthetic fibre to the surface. Longitudinal joints are cut at 24 hours with a track-mounted saw, and the cut edges are sealed after 7 days of curing under a sprayed acrylic membrane. Terminal products include irrigation canal linings, flood diversion channels, stilling basin aprons, and lined drainage swales for mining pads. The fibre does not impair watertightness at the stated addition window, but the canal lining must not be placed at ambient temperatures below 5°C unless a heated aggregate system is available, because the combined effect of cold matrix viscosity and fibre stiffness increases the risk of irregular edge tearing behind the slipform.
Thin-return architectural cladding panels produced in battery moulds are susceptible to differential shrinkage cracking because the return edge cools and loses moisture faster than the main panel face. SikaFiber Novomesh CAL-51 is added at 1.5 kg/m³ to 2.5 kg/m³ for the macro-synthetic fraction, while the micro-synthetic fraction is increased to 0.9 kg/m³ when the panel is exposed to forced convection during early-age curing. Compliance is addressed under EN 13369 for precast concrete products, with fibre conformity under EN 14889-2:2006 and the concrete mix design evaluated according to EN 206. The batch is prepared in a pan mixer with the fibres added after the pigment slurry and before the final water adjustment, because pigment addition after fibre introduction produces uneven colour distribution along fibre-matrix interfaces. Slump is maintained at 90–130 mm, and the mix is placed into CNC-machined steel moulds with exterior form vibrators operating at 40–60 Hz in 5–8 second intervals.
After casting, the panel surface is struck off with a vibratory beam, and open surfaces are covered with a polymer curing membrane within 30 minutes. Demoulding occurs at 16–18 hours after a curing cycle that includes 6 hours at 60°C followed by a slow cooling phase. The main field data from precast plants is that edge damage during demoulding and handling is reduced relative to plain concrete at the same cycle time, but the benefit is conditional on proper vibration; under-vibration traps fibre balls near the return edge, while over-vibration brings the macro-synthetic fibre to the form face and creates a visible surface pattern. Terminal products include architectural façade panels, cornice units, column cladding shells, and rainscreen fins. The fibre system does not replace the stainless steel armature embedded in large cantilever panels, and it is not specified for structural load transfer at panel anchor zones unless the design engineer has confirmed post-crack flexural capacity by EN 14651.
For bridge deck overlay mixes subjected to early-age thermally induced restraint, the principal requirement is crack width control during the first 72 hours of hardening, not long-term post-crack toughness. The fibre blend is specified with a macro-synthetic fraction at 3.0 kg/m³ to 4.5 kg/m³ and a micro-synthetic fraction at 0.6–0.9 kg/m³. The overlay concrete is evaluated under ASTM C1579-21 for plastic shrinkage cracking, ASTM C1116/C1116M for fibre-reinforced concrete classification, and ACI 544.3R-08 for proportioning guidance. The mix is produced in a mobile continuous mixer and placed by a vibratory truss screed at a thickness of 50–100 mm over the scarified bridge deck. Fibre addition is made through a calibrated volumetric dispenser at the mobile mixer inlet, because manual bag addition into a small paver hopper produces intermittent fibre clusters that appear as surface blemishes after grinding.
The overlay is consolidated with a double-beam truss screed and then finished with a bull float, followed by wet curing for 7 days using continuously moistened geotextile fabric. The main process conflict occurs when ambient temperature exceeds 35°C: the increased matrix viscosity lowers fibre movement during consolidation and reduces surface finish quality. The operational boundary is therefore a maximum concrete placement temperature of 32°C. Terminal products include reinforced concrete bridge deck overlays, approach slab overlays, ramp decks, and pier cap protective overlays. The macro-synthetic fibre does not convert the overlay into a structurally standalone component; deck loads are still transferred to the substrate and existing reinforcement, and the fibre system serves to reduce early-age crack penetration that would permit chloride ingress under cyclic traffic and de-icing salt exposure.
Competitive SikaFiber Novomesh CAL-51 (Novomesh CAL-51) - Macro Synthetic and Micro Synthetic Fiber prices that fit your budget—flexible terms and customized quotes for every order.
For samples, pricing, or more information, please contact us at +8618112911328 or mail to sales1@liwei-chem.com.
We will respond to you as soon as possible.
Tel: +8618112911328
Email: sales1@liwei-chem.com
Flexible payment, competitive price, premium service - Inquire now!
| Property | Steel fibre | Novomesh CAL-51 macro component | Micro-only synthetic fibre |
|---|---|---|---|
| Density | 7.85 g/cm³ | 0.91 g/cm³ | 0.90–0.91 g/cm³ |
| Elastic modulus | 200 GPa | 6.0 GPa | 3.5–6.0 GPa |
| Tensile strength | 1000–1500 MPa | 550 MPa | 350–600 MPa |
| Corrosion | Susceptible without galvanic or matrix protection | Inert | Inert |
| Typical dosage for slab crack control | 15–35 kg/m³ | 3.0–5.0 kg/m³ | 0.6–0.9 kg/m³ |
| Primary standard | EN 14889-1 or ASTM A820/A820M | EN 14889-2:2006 Class II | EN 14889-2:2006 Class I |
| Standard / test method | Scope | Relevance |
|---|---|---|
| EN 14889-2:2006 | Fibres for concrete — Part 2: Polymer fibres — Definitions, specifications and conformity | CE marking classification for Class II macro fibre and Class I micro fibre |
| ASTM C1116/C1116M | Standard Specification for Fiber-Reinforced Concrete | Classification of fibre type and concrete specification |
| ASTM C1609/C1609M | Flexural performance of fibre-reinforced concrete using beam with third-point loading | Residual strength at specified net deflections |
| ASTM C1399/C1399M | Obtaining average residual strength of fibre-reinforced concrete | Alternative post-crack performance assessment |
| EN 14651 | Test method for metallic fibre concrete — measuring the flexural tensile strength | Limit of proportionality and residual flexural tensile strength selection |