| HS Code | 234140 |
| Product Name | MasterFiber 230 |
| Material | Polypropylene |
| Fiber Type | Macro synthetic fiber |
| Form | Embossed monofilament |
| Length | 54 mm |
| Diameter | 0.9 mm |
| Aspect Ratio | 60 |
| Density | 0.91 g/cm³ |
| Tensile Strength | 570 MPa |
| Elastic Modulus | 9.5 GPa |
| Melting Point | 160 °C |
| Ignition Point | 360 °C |
| Alkali Resistance | Excellent |
| Water Absorption | Nil |
| Corrosion Resistance | Yes |
| Recommended Dosage | 3 to 9 kg/m³ |
As an accredited MasterFiber 230 - Polypropylene Macro Fiber factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.
| Packing | MasterFiber 230 Polypropylene Macro Fiber is supplied in 20 kg moisture-resistant bags, palletized for convenient storage and handling. |
| Container Loading (20′ FCL) | 20′ FCL loaded with palletized MasterFiber 230 polypropylene macro fiber bags, shrink-wrapped and securely stowed for safe ocean transport. |
| Shipping | MasterFiber 230 – Polypropylene Macro Fiber ships as a non-hazardous, non-regulated material with no UN number. It is typically supplied in moisture-resistant bags or cartons on pallets. Store in a cool, dry, ventilated area, away from open flame and UV. Handle with care to prevent package damage during transport. |
| Storage | Store in a cool, dry, well-ventilated area in original sealed packaging. Keep away from direct sunlight, heat, open flames, and ignition sources. Protect from moisture, dirt, and chemical contamination. Stack pallets securely to prevent package damage or collapse. Maintain moderate temperatures and avoid excessive humidity. Observe normal good housekeeping. Use oldest stock first. Do not store outdoors unprotected. Keep containers closed. |
| Shelf Life | MasterFiber 230 Polypropylene Macro Fiber has indefinite shelf life when stored dry, in original packaging, away from moisture and sunlight. |
In hard-rock TBM starter tunnels, cross-passage junctions, and NATM crown support zones, MasterFiber 230 is added as a collated macro-synthetic reinforcement component in wet-mix sprayed concrete. Mix designs are typically batched to a target slump of 120 mm to 180 mm at the pump, with maximum aggregate size of 8 mm to 10 mm, silica fume or metakaolin at 5% to 8% by mass of cementitious material, and a polycarboxylate ether superplasticizer to hold the water-cementitious ratio below 0.45. Fiber addition of 4 kg/m³ to 7 kg/m³ is introduced into the pan or twin-shaft mixer after coarse aggregate and before all liquids have completed wetting; collated bundles require 45 seconds to 75 seconds of high-shear mixing after liquid addition, with the longer time applied to worn mixer liners and large batch sizes. Spray application uses a wet-spray unit with a 50 mm to 65 mm delivery line and a robotic manipulator or hand nozzle. The accelerator is injected at the nozzle at 3% to 8% by mass of cementitious material; high-alkali aluminate accelerators produce a rapid setting layer, while alkali-free accelerators preserve later strength gain but may require higher dosage when used with macro fibers. Layer build-up in the crown is limited to 75 mm to 150 mm per pass to avoid rebound losses above 20%. The cured lining is assessed for energy absorption under EN 14488-5 at 25 mm central deflection or ASTM C1550-20 at 40 mm central deflection; project specifications frequently set minimum energy absorption values between 700 J and 1,000 J depending on ground class. Fiber conformance is checked against EN 14889-2:2006 System 1 attestation or ASTM C1116/C1116M Type III, with batch-level geometry and tensile strength records retained for tunnel QA. The operational boundary is that low-slump mixes below 100 mm at the pump create fiber clustering at the pump hopper screen; field batching logs show that delayed superplasticizer addition after fiber wetting can generate lumps requiring 10–15 minutes of additional mixing to disperse. MasterFiber 230 is not a replacement for rock bolts or lattice girders in high-convergence ground; it functions as crack-width control and spalling mitigation in the shotcrete shell, and its post-crack contribution must be verified by project-specific test panels before permanent lining design is finalized.
For slabs cast on profiled steel deck in commercial and logistics buildings, the conventional welded-wire reinforcement at the upper third of the slab is frequently substituted with a macro-synthetic fiber system when the deck profile depth is between 50 mm and 76 mm and the total slab thickness is 100 mm to 150 mm. The fiber dosage is determined by flexural toughness testing under ASTM C1399/C1399M or residual flexural strength under ASTM C1609/C1609M-19a, not by manufacturer dosage tables alone. Concrete for metal deck placement is specified as normal-weight with maximum aggregate size of 10 mm to 14 mm, pump slump of 130 mm to 180 mm, and air content below 3% to prevent excessive pump-line compression. MasterFiber 230 is added at 3.0 kg/m³ to 5.5 kg/m³ for typical uniformly loaded office or mezzanine decks; the lower range is used when positive moment capacity is dominated by the steel deck and shear studs, while the upper range is used when the slab must provide residual moment capacity under concentrated wheel loads. Before replacement of mesh, the mix is prequalified with a minimum average residual strength of 140 kPa to 240 kPa at 2.0 mm net deflection under ASTM C1399/C1399M, corresponding to L/150 of a 300 mm span, depending on slab thickness and design traffic category. Pumping trials are required because the fiber bundles must pass through 50 mm to 75 mm rubber delivery hoses without re-agglomeration; concrete pump pressures may rise by 0.5 MPa to 1.5 MPa compared with plain concrete at the same slump. The placement sequence is discharge, strike-off with a laser screed or vibrating truss, bull-float, wait for bleed water to clear, and power-trowel. Macro fibers dispersed in the top 5 mm can catch power trowel blades; open-blade pan finishing at elevated speed should be limited until the surface has hardened enough to cut the fibers rather than pull them. The finished deck does not eliminate welded shear studs, edge angles, or structural steel design; fiber reinforcement replaces the mesh only where the construction load case and fire engineering have been independently validated. Published data for this specific MasterFiber 230 dosage in composite metal decks is limited where fire spalling resistance is referenced, and no conclusion regarding fire rating should be drawn without furnace testing under the applicable floor assembly standard.
Precast electrical pull boxes, storm drainage vaults, catch basin bases, and water meter chambers are frequently produced with a 3.0 kg/m³ to 5.0 kg/m³ dosage of MasterFiber 230 to reduce corner spalling during demolding, crane handling, and backfill placement. The concrete mixture for wet-cast utility sections is designed for a 28-day compressive strength of 35 MPa to 45 MPa, aggregate size of 10 mm or 14 mm, and a targeted slump of 100 mm to 150 mm. Fiber is charged through the plant batching hopper at the same point as coarse aggregate; in twin-shaft mixers, wet mixing time after fiber addition is extended to 70 seconds to 90 seconds at 30 rpm to 45 rpm to prevent dry bundles from reaching the discharge gate. Formwork is filled with external vibrators at 8,000 vpm to 12,000 vpm, but vibration time should not exceed 15 seconds per position because excessive vibration can orient fibers downward and leave the top surface deficient. Demolding times in unheated plants are generally based on a compressive strength of 15 MPa, which may be reached after 16 hours to 24 hours with a Type C accelerator or controlled steam curing. The commercial justification is the elimination of welded wire fabric in walls of 150 mm to 250 mm, where covers to reinforcement are difficult to maintain under ACI 318 and CSA A23.1 cover requirements; fibers do not create a corrosion path in sulfate-bearing soils. Flexural toughness is documented with ASTM C1609/C1609M as a prequalification test, with design residual strength at L/600 limited to 1.0 MPa to 1.8 MPa for pavement-grade utility lids and covers. A limitation: cyclic traffic loads on direct-buried box culverts must still be analyzed as reinforced concrete sections; MasterFiber 230 alone does not replace primary steel in a hydraulically loaded structural vault. Published data for this specific configuration is limited for hydrodynamic scour conditions, so the designer must evaluate abrasion resistance in accordance with ASTM C944/C944M or project-specific rotating-cutter tests.
High-bay distribution center floors and automated guided vehicle aisles are cast in large panel sections with square or rectangular saw-cut plans at column spacing from 6 m to 12 m. MasterFiber 230 is commonly batched at 3.0 kg/m³ to 6.0 kg/m³ in normal-weight concrete with 20 mm coarse aggregate, a 28-day target compressive strength of 30 MPa to 45 MPa, and a slab thickness of 150 mm to 250 mm. The performance criterion is not compressive strength but post-crack residual flexural strength determined by ASTM C1609/C1609M-19a, with acceptance values for slabs on ground usually defined at net deflections of L/600 and L/300. Typical prequalification requires a residual strength ratio R3≥0.20 or absolute residual strength of 0.5 MPa to 1.2 MPa at L/600, and R3≥0.10 at L/300, depending on racking leg load and concrete thickness. During construction, the concrete is placed by truck chute or boom pump, struck off with a laser screed, bull-floated, and power-troweled. The placement rate must be high enough to close the surface before initial set when ambient conditions exceed 25°C and wind speed is above 10 km/h, because macro fibers near the surface accelerate the loss of bleed-water path and can cause early plastic crusting. Saw-cut joints are opened with early-entry saws within 4 hours to 8 hours of final troweling or conventional wet-cut saws within 12 hours to 24 hours; the saw-cut depth is set at one-quarter to one-third of slab thickness. Fiber reinforcement permits joint spacing to remain within 4.5 m to 6.0 m for load-carrying industrial floors, but if joint spacing exceeds the designer’s shrinkage model, macro synthetic fibers do not suppress all drying shrinkage cracks—they control crack width after initiation. Field data from production-scale placements shows that fiber clustering at the hopper discharge increases sharply when concrete slump drops below 120 mm after 90 minutes of transit; retempering with water after fiber addition is prohibited. A documented batch-to-batch variance of ±0.2 kg/m³ in fiber dosing is within tolerance, but if the fiber dosing unit is not calibrated after each 20 tonnes of aggregate, an under-dose may reduce residual load capacity below the specified lane test value. The finished surface should not be burnished to a glassy finish over macro-fiber concrete if the floor is subject to air-tight pallet truck wheels, because slight polymer fiber stubble may appear after diamond grinding; this condition is mechanical, not a chemical incompatibility.
Concrete overlays for bus lanes, intersection aprons, and municipal pavement patching are placed with high cement replacement by fly ash or slag, creating a dense paste phase that challenges collated polypropylene macro fiber distribution. Overlay mix designs in this segment are typically 100 mm to 150 mm thick, with 25 MPa to 35 MPa compressive strength at 28 days, 12.5 mm top-size aggregate, and cementitious content of 350 kg/m³ to 420 kg/m³. Fly ash at 15% to 25% by mass increases paste viscosity and delays setting time; when MasterFiber 230 is added at 3.0 kg/m³ to 4.5 kg/m³, the combination of pozzolanic thickening and fiber surface area can reduce slump by 40 mm to 70 mm unless a polycarboxylate superplasticizer is added after fiber wetting. The processing conflict arises in slipform and roller screed placement: stiff concrete below 25 mm slump provides good edge retention but creates surface dragging at the paver pan, leaving macro fiber ends exposed. The standard practice is to hold delivered slump at 40 mm to 70 mm for screed placement and to verify fiber distribution using a washout test across three samples from the paver hopper. Residual performance is characterized under ASTM C1609/C1609M or ASTM C1550-20; for a 120 mm overlay, round panel energy at 40 mm central deflection often falls between 250 J and 450 J at 4.0 kg/m³ dosage in laboratory mixes, though published data for this specific configuration is limited and project trial batches are required. Transverse joints remain a separate load-transfer mechanism; macro fibers are not a substitute for dowels or tie bars where AASHTO joint load-transfer requirements apply. The overlay must be cured with a high-solids curing compound meeting ASTM C309 immediately after texturing; polypropylene macro fiber exposed at the surface can trap curing compound and cause local discoloration, but does not affect bond strength to the prepared substrate. Substrate preparation under ACI 546R or agency specifications governs overlay performance; if the prepared surface roughness is below ICRI CSP 4 after abrasive blast, failure will occur at the interface before any fiber contribution can be mobilized.
| Test standard | Property evaluated | Typical acceptance reference for macro synthetic fiber concrete |
|---|---|---|
| ASTM C1116/C1116M | Synthetic macro fiber conformance, geometry, and tensile strength | Type III fiber with length and aspect ratio documented in batch records |
| EN 14889-2:2006 | Polymer fiber CE marking and factory production control | System 1 attestation with notified body certification |
| ASTM C1609/C1609M-19a | Post-crack residual flexural strength | R3≥0.20 at L/600 and R3≥0.10 at L/300 for many slab prequalifications |
| ASTM C1399/C1399M | Average residual strength after first crack | 140 kPa to 240 kPa at 2.0 mm net deflection, project-specific |
| ASTM C1550-20 | Round panel energy absorption | 250 J to 1,000 J at 40 mm central deflection depending on application class |
Accelerated curing of precast manhole bases, concrete pipe end sections, and pocket foundations using atmospheric steam at 50°C to 65°C changes the early-age matrix surrounding polypropylene macro fibers because high early temperature accelerates cement hydration and increases the bond between paste and fiber surface. MasterFiber 230 is geometrically stable at these temperatures, but process control must prevent concrete core temperature from exceeding 80°C during the curing hold; above that threshold the polypropylene modulus decreases and the fiber may become temporarily less effective during hot stripping and early handling. The steam cycle is programmed as a ramp at 10°C/h to 15°C/h to the hold temperature, a hold period of 4 hours to 8 hours, and a cooling rate not exceeding 15°C/h. Fiber dosage in steam-cured wet-cast utility products is typically 3.0 kg/m³ to 5.0 kg/m³, with the lower range for thin-wall manhole bases and the upper range for large pocket foundations with lifting anchors. The mix is designed to 28-day compressive strength of 40 MPa to 50 MPa, and the steam-curing schedule is targeted to reach a strip strength of 15 MPa to 20 MPa within 8 hours of finishing. Washout testing of the fiber from fresh concrete under ASTM C1116/C1116M sampling should be conducted on the first three batches after every curing chamber start-up, because condensed moisture can enter the mixer discharge chute and cause bundles to stick before re-dosing. The finished cured elements show no chlorine-induced corrosion path in wastewater service; however, fiber-reinforced concrete does not eliminate conventional steel in zones where lifting pins and buried pull irons are cast. Published data for this specific configuration is limited regarding long-term residual strength retention after 20 years of wet-dry cycling, so designers should apply a material reduction factor consistent with service-life assumptions in fib Model Code 2010 or the applicable national annex.
Competitive MasterFiber 230 - Polypropylene Macro Fiber prices that fit your budget—flexible terms and customized quotes for every order.
For samples, pricing, or more information, please contact us at +8618112911328 or mail to sales1@liwei-chem.com.
We will respond to you as soon as possible.
Tel: +8618112911328
Email: sales1@liwei-chem.com
Flexible payment, competitive price, premium service - Inquire now!
Welded wire mesh in slab-on-ground construction is required to be positioned in the upper one-third of the slab cross-section, typically with a cover tolerance of ±10 mm under ACI 360R-10 recommendations. Field placement on chairs or slab bolsters is often displaced by worker foot traffic before and during concrete placement. In flatwork, displacement of the mesh toward the bottom of the slab negates its ability to restrain drying shrinkage cracking at the top surface. MasterFiber 230 is dosed into the concrete matrix before discharge and remains distributed through the full depth of the section after vibration. No separate placement or fixing operation is required, and no mesh sheets need to be lapped at joints. The labor and crane time associated with unloading, cutting, and placing welded wire mesh is eliminated.
For crack-width control under restrained drying shrinkage, specification commonly compares the performance of macro synthetic fiber with that of 6×6-W1.4×W1.4 welded wire mesh. The substitution is not made on a direct geometric basis; instead, the fiber dosage is selected to provide equivalent post-crack residual strength under ASTM C1609/C1609. The use of MasterFiber 230 at 3.0 kg/m³ is often specified where mesh would be used for temperature and shrinkage reinforcement in interior slabs. Published project-specific residual strength data can vary with aggregate angularity, paste volume, and mixing energy; trial batching is therefore required to confirm the dosage for a specific concrete mixture.
Post-crack performance of fiber-reinforced concrete is determined by beam tests under third-point loading. In ASTM C1609/C1609, a 150 × 150 × 500 mm beam is loaded in a closed-loop servo-hydraulic testing machine, with residual loads recorded at net deflections corresponding to span/600 and span/150. The measured residual strengths are expressed as f600 and f150. MasterFiber 230 is evaluated at selected addition rates because residual strength is not a fixed material property; it is a composite response that depends on fiber content, embedment length, fiber orientation, concrete matrix strength, and aggregate particle size.
At the lower end of the recommended addition range, 1.8 kg/m³, the product is intended for control of drying shrinkage and thermal contraction cracking in slabs on ground. Intermediate dosages between 3.0 kg/m³ and 4.5 kg/m³ are used where higher post-crack flexural toughness is required, including industrial floor slabs subject to fork truck axle loads and pavements with defined joint spacing. The upper dosages near 5.3 kg/m³ are generally restricted to shotcrete and precast elements where the higher fiber volume compensates for orientation effects near free surfaces or sprayed surfaces. Publicly available manufacturer-published test data do not provide a universal f150 value across all concrete strengths; design should be based on project-specific mixtures and trial batches.
In production-scale ready-mix operations, the fiber bags are added at the plant or site to the truck drum after aggregate, cement, and water. The drum is rotated at maximum speed for 5–7 minutes after bag addition to disperse the fibers and dissolve the packaging. Premature discharge before complete bag dissolution has been observed to create intermittent fiber clumps at the slab surface in field placements; extending mixing time or adding the bags with the coarse aggregate in a compulsory mixer prevents this defect. In twin-shaft compulsory mixers with batch sizes of 2.0–3.0 m³, the fibers are charged after the first half of the aggregate volume to avoid fiber wrapping around the mixer shaft bearings.
Because the macrofiber increases the apparent yield stress of fresh concrete, slump measured under ASTM C143/C143 may decrease at higher addition rates. Trial batching should include adjustment of superplasticizer dosage to maintain the specified slump without increasing free water content; otherwise, the water-cement ratio may rise and reduce compressive strength measured under ASTM C39/C39. Air content measured under ASTM C231/C231 is generally not significantly affected by the fiber itself, but entrained air void spacing may be marginally disturbed at very high fiber volumes and should be verified in the trial mixture.
Wet-mix shotcrete for rock retention, tunnel linings, and slope stabilization uses MasterFiber 230 at addition rates between 3.0 kg/m³ and 5.3 kg/m³. The fiber is mixed into the concrete before pumping; the mix passes through a piston-type wet-mix shotcrete pump and is applied through a nozzle where compressed air accelerates the material. Unlike welded wire mesh, the fiber is delivered as part of the concrete stream, eliminating the need for workers to fix mesh against an irregular rock surface before spraying. The nonmetallic fiber also removes the cut and puncture hazards associated with loose steel fibers during nozzle operation and rebound cleanup. Sprayed concrete performance is typically evaluated by round panel testing under ASTM C1550 or beam testing under EN 14488-3. The specified energy absorption class governs the required dosage. Because polypropylene fibers are inert in acidic groundwater and sulfate-bearing service conditions, surface staining from fiber corrosion at shrinkage cracks is absent. MasterFiber 230 is structurally distinct from micro polypropylene fibers of 6–19 mm length. Microfibers are dosed at 0.6–1.2 kg/m³ to reduce plastic settlement and plastic shrinkage cracking, but their short embedment length provides negligible post-crack residual strength. The 54 mm length and deformed monofilament geometry of MasterFiber 230 develop mechanical anchorage and friction across a crack, allowing load transfer after the matrix has cracked. Specifications should not accept microfiber products as a substitute for a macro fiber on a weight basis.Steel fibers are generally supplied with a tensile modulus near 200 GPa and a density near 7.85 g/cm³. Polypropylene macro fibers have a much lower tensile modulus, commonly on the order of 3–5 GPa, and a density of 0.91 g/cm³. At equal mass dosage, the polypropylene fiber yields a substantially higher fiber count per cubic meter because of the density difference, but the lower modulus means that post-crack stiffness and crack-width control under sustained load may be lower. Direct substitution of steel fiber by MasterFiber 230 on a one-to-one weight basis is therefore not technically valid. The replacement dosage should be selected by comparing the required residual strength class or energy absorption class in the project specification, not by equating fiber mass.
Where concrete is exposed to chlorides or carbonation, uncoated steel fibers at the surface may show corrosion staining if cracks reach the surface. MasterFiber 230 has no redox corrosion mechanism in these environments. This makes it suitable for marine splash zone slabs, tunnel drainage channels, and water retaining structures where fiber corrosion staining is unacceptable. The operational boundary is that the polypropylene macro fiber is not a substitute for primary flexural reinforcement in structural members requiring yield-strength crack control under ACI 318-19 or EN 1992-1-1; it is used for secondary reinforcement and crack-width distribution unless the structural design explicitly follows the residual strength design provisions of the fib Model Code 2010.
The following matrix identifies the core standards governing specification, testing, and application of MasterFiber 230. The product should be specified by reference to these designations, not solely by fiber length or polymer type.
| Standard | Designation or Clause | Parameter Controlled |
|---|---|---|
| ASTM C1116/C1116 | Type III | Synthetic fiber-reinforced concrete classification |
| EN 14889-2:2006 | Class II | Polymer macrofiber specification and CE marking |
| ASTM C1609/C1609 | f600, f150 | Post-crack residual flexural strength under third-point loading |
| ASTM C1399/C1399 | Average residual strength | Alternative residual strength measurement for fiber-reinforced concrete |
| ASTM C1550 | Panel energy absorption | Shotcrete round panel toughness and post-crack capacity |
| ASTM C157/C157 | Length change | Drying shrinkage evaluation for crack-control design |
| ACI 544.3R | Proportioning and mixing | Guidance for fiber distribution, batching, and trial mixes |
Packaging and storage conditions also affect field performance. The fibers are supplied in water-soluble bags or bulk dispensing boxes; storage should be in dry conditions below 60% relative humidity to prevent premature dissolution of the packaging. The polypropylene polymer has a melting point near 160°C, so continuous service exposure above 80°C is outside the intended application envelope. In heated or steam-cured precast operations, peak concrete temperature should not exceed 80°C during curing unless verified by trial batching and post-crack performance testing.