| HS Code | 814929 |
| Material | Polypropylene/polyethylene blend |
| Form | Macro synthetic monofilament fiber |
| Color | Gray |
| Fiber Length | 54 mm |
| Equivalent Diameter | 0.9 mm |
| Aspect Ratio | 60 |
| Tensile Strength | 600 MPa |
| Elastic Modulus | 9 GPa |
| Specific Gravity | 0.91 |
| Melting Point | 160 °C |
| Alkali Resistance | Excellent |
| Chloride Resistance | Excellent |
| Dosage Range | 3 to 9 kg/m³ |
| Packaging | 10 kg bags |
| Compliance | ASTM C1116 Type III; EN 14889-2 Class I |
As an accredited MasterFiber MAC 360 - Structural Macro Synthetic Fiber factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.
| Packing | MasterFiber MAC 360 structural macro synthetic fiber: 5 lb (2.27 kg) moisture-resistant bags, 50 bags per carton. |
| Container Loading (20′ FCL) | 20′ FCL: 20 pallets, 800 bags of 10 lb (4.5 kg) MasterFiber MAC 360, totaling approximately 3,600 kg net weight. |
| Shipping | MasterFiber MAC 360 – Structural Macro Synthetic Fiber ships as a non-hazardous, non-regulated solid in sealed moisture-resistant bags or cartons, typically palletized and shrink-wrapped. No special DOT, IMDG, or IATA hazardous-materials documentation is required. Store and transport in a dry, cool area, avoiding package damage. |
| Storage | Store MasterFiber MAC 360 in original, unopened packaging in a cool, dry, well-ventilated area. Protect from moisture, direct sunlight, and extreme temperatures. Keep pallets off the floor on clean, dry surfaces. Prevent dust, contamination, and bag damage. Reseal opened packages. Use FIFO stock rotation and follow local regulations and manufacturer instructions. Do not store near incompatible materials or ignition sources. |
| Shelf Life | MasterFiber MAC 360 has a 24-month shelf life when stored in original unopened packaging, dry, and protected from moisture and sunlight. |
For precast box culvert segments manufactured under ASTM C1577-20, the use of MasterFiber MAC 360 modifies the conventional two-way reinforcement layout only when the design engineer reclassifies the culvert walls and top slab as a hybrid fiber-reinforced section. The wet-cast mix design at a water-to-cement ratio between 0.40 and 0.45 is typically adjusted with high-range water reducers to maintain internal vibration response without slurry pooling at form corners. At the central mixer, the fiber charge is introduced after coarse aggregate and sand but before cement and water. This sequencing reduces fiber balling in low-mobility box culvert concrete. The dosing equipment should be a vibratory feed or conveyor interlocked with the aggregate scale because manual bag addition into a rapidly mixing pan mixer creates batch-to-batch variance and occasional fiber clusters that accumulate on external vibrator mounts and form face ribs. Surface finish on the inner flowline is governed by vibration time and form release chemistry. Excessive internal vibration can promote fiber alignment at the casting face and produce surface wicking after demoulding. Post-strip grinding is then required to restore hydraulic smoothness in the invert.
Early-age crack control in the top slab of a box culvert is influenced by the restraint exerted by the hardened sidewalls. MasterFiber MAC 360 introduces post-crack residual tensile capacity, but published data specific to this product in full-scale box culvert bending tests is limited. The residual load values obtained from ASTM C1609-19 beam specimens cannot be linearly transferred to full-section behavior without considering section depth, two-way flexure, and the contribution of conventional reinforcement. Where design acceptance is based on crack width under earth load and live load, the residual flexural tensile strength from EN 14651:2007 should be used as an input parameter in a cracked-section analysis rather than as a direct substitute for reinforcing steel area. Production trials on the actual batch plant should verify that fiber addition does not increase mixing cycle time beyond the plant’s continuous feed rate for steam-cured or moist-cured box sections.
MasterFiber MAC 360 is introduced into truck-mixed or central-mixed concrete for jointless ground-supported industrial slabs as structural macro-synthetic reinforcement. The batching sequence is adjusted so that the fiber charge enters after coarse aggregate and sand but before the water and chemical admixtures. This placement sequence prevents the fiber from contacting a dry cement-rich zone and reduces clumping in paddle mixers and truck drums. The addition rate is established between 2.0 kg/m³ and 4.5 kg/m³ depending on the required residual flexural strength ratio from ASTM C1609-19. Uniform fiber distribution is verified by performing a wash-out check on the first mixer load or by comparing prism beam residual load curves from the first and last load of a pour. In warehouse and distribution center floors, the specification is commonly based on a residual strength ratio f100/f1 of not less than 0.15 or an average residual strength above 1.0 MPa at specified deflections. ACI 360R-10 provides floor design guidance, while CE marking under EN 14889-2:2006 documents the fiber’s structural class and release of dangerous substances.
The finishing sequence on fiber-reinforced slabs differs from plain concrete because macro fibers may protrude at the power-trowelled surface if the final pass is executed too late. Laser screed strike-off and subsequent trowelling are typically completed at a slightly earlier stage than with welded wire reinforcement to avoid tearing the surface paste. Saw-cutting of contraction joints is scheduled after the slab reaches sufficient strength to prevent fiber pull-out at the saw kerf, often within 6 to 12 hours under normal curing conditions. The slab should not be specified as a primary structural replacement for suspended slabs; MasterFiber MAC 360 controls post-crack load transfer across floor joints but does not introduce the same global load path as continuous reinforcing bars in suspended floor systems.
Wet-mix sprayed concrete linings for underground support require a macro synthetic fiber that remains pumpable through a piston pump and a nozzle injection system. MasterFiber MAC 360 is added to the wet-mix at the batch plant or in the on-site truck mixer at rates commonly between 3.0 kg/m³ and 6.0 kg/m³, with the final dosage determined by the energy absorption class prescribed for the tunnel advance. The plastic concrete is delivered at a slump of 180 mm to 220 mm before accelerator addition. The fiber must not increase the pump line pressure beyond the established project baseline, and the nozzle operator must confirm that air supply adjustments do not separate the fiber from the paste stream. Shotcrete with macro synthetic fiber requires the same nozzle distance of 1.0 m to 1.5 m as conventional steel-fiber shotcrete to maintain compaction and minimize rebound.
Energy absorption measured on square panels according to EN 14488-5:2006 provides the acceptance criterion for sprayed concrete in squeezing ground and temporary rock support. For permanent or temporary linings classified in accordance with EN 14487-1:2005, the panel performance is expressed as a minimum energy absorption at 25 mm central deflection. The residual tensile performance of the hardened composite is additionally checked by EN 14651:2007 beams when the design engineer specifies constitutive tensile parameters for numerical lining analysis. Accelerator compatibility is a process conflict that requires field validation. Alkali-free accelerators change the hydration chemistry of the cement paste and can reduce early-age fiber-matrix bond when the accelerator dosage exceeds 7% by weight of cement. A nozzle trial must establish whether fiber rebound on vertical surfaces changes at the upper accelerator dosage band. Rebound values for macro synthetic fiber shotcrete are generally controlled by adjusting air entrainment, nozzle angle, and the ratio of sprayed layer thickness to fiber length.
| Standard | Test configuration | Reported parameter | Typical acceptance basis |
|---|---|---|---|
| EN 14488-5:2006 | Square panel, load applied at panel centre | Energy absorption up to 25 mm central deflection | Energy class selected by rock support design |
| EN 14651:2007 | Notched beam, three-point loading | Residual flexural tensile strength at CMOD 0.5 mm and 3.5 mm | Constitutive law input for lining design |
| ASTM C1550-12a | Round panel, centre point loading | Energy absorption up to 40 mm central deflection | Comparative field quality control |
The nozzle operator must record the fiber addition rate and the air flow setting on each sprayed batch. When the spray robot or manual nozzle moves to a new section, the first 0.5 m³ of shotcrete should be inspected for rebound pockets and fiber aggregation behind the nozzle tip. Published project data specific to MasterFiber MAC 360 in shotcrete with high-molecular-weight dry-mix accelerators is limited; therefore the on-site quality control plan must include early-age adhesion tests and hardened panel tests from the actual pump and accelerator combination.
For unbonded and bonded concrete pavement overlays placed over existing asphalt or deteriorated concrete, MasterFiber MAC 360 is used to suppress early-age transverse and longitudinal cracking and to maintain load transfer at contraction joints. The design of a thin concrete overlay for moderate traffic loading may use residual flexural strength ratios derived from ASTM C1609-19 beams. Specification limits are project-derived because no single minimum residual strength value governs all overlay types under all climate and subgrade conditions. The concrete mixture is specified with a maximum aggregate size of 19 mm to prevent fiber accumulation behind the slipform paver’s vibratory consolidation unit. The fiber addition rate is typically set between 2.0 kg/m³ and 4.0 kg/m³, with the final value verified by pre-construction beam testing at the project batch plant.
During paving, continuous batch documentation must record fiber addition from calibrated weigh hoppers. Hand bag counting is not sufficient because dosage deviations may exceed ±0.2 kg/m³ on consecutive truck loads, and such deviation can shift the residual load response enough to require re-testing from the next beam sample. Texture depth measured by ASTM E965-15 is retained because macro synthetic fibers do not replace surface macrotexture for skid resistance. The paving train operates at a speed that allows the vibration unit to consolidate the slab without drawing fibers to the surface. A slow paving rate with excessive vibrator frequency can create fiber-rich planes along the longitudinal construction joints and reduce the effectiveness of tie bar insertion.
When concrete is pumped onto cold-formed steel decking, the restrained overlay condition creates tensile strain at the deck-topping interface due to differential drying shrinkage and thermal movement. MasterFiber MAC 360 is introduced into the concrete topping at a dosage between 2.0 kg/m³ and 3.5 kg/m³ to provide plastic shrinkage crack control and moderately increase residual tensile capacity after first cracking. The primary flexural resistance of the composite floor system is supplied by the composite section and welded studs, not by the residual tensile capacity of the topping. The topping thickness above the steel deck is typically between 75 mm and 150 mm, and the fiber length must remain less than one-half of the minimum topping cover to avoid entanglement at pump line couplings and placement hose reducers. Compressive strength acceptance is governed by ASTM C39/C39M-21, while post-crack load retention is measured by ASTM C1609-19 beams when required by the structural engineer. Published data for MasterFiber MAC 360 in composite deck toppings is limited; therefore the flooring contractor should conduct a pump and placement trial on a representative deck profile before production pours.
Precast concrete tunnel segments produced in carousel plants use high-range water reducers at dosages that produce slump retention over 60 minutes while maintaining a water-to-cement ratio below 0.35. MasterFiber MAC 360 is added only after the high-range water reducer has been sufficiently dispersed into the paste, because early addition of fiber to an undispersed polycarboxylate can generate fiber-balling zones around the mixer blades and segment form corners. A central twin-shaft mixer with a mixing cycle of 120 seconds after final fiber addition is used to achieve uniform distribution. A planetary counter-current mixer typically requires 60 seconds additional dry-mix time before water addition. The fiber content in precast segments is usually confirmed by washing out a sample of fresh concrete and comparing recovered fiber weight against the batch target.
Steam curing of segment moulds at 60°C to 70°C accelerates early strength gain, and the macro synthetic fiber remains dimensionally stable within this temperature range. However, demoulding green strength is controlled by cement type and curing curve, not by the fiber. Early demoulding before 12 MPa compressive strength is reached can tear fiber bundles protruding from the gasket seats and sealing grooves, creating local defects that require repair. Segment geometry is checked with a three-dimensional laser scanner or a geometry-checking frame according to the project specification. The presence of macro synthetic fiber does not permit relaxation of twist, convergence, or lateral offset tolerances in segment assembly. Replacement of steel fiber with macro synthetic fiber in precast segments is evaluated through full-scale bending tests on curved beam specimens or through direct tension tests. The design does not substitute an equal weight of MasterFiber MAC 360 for steel fiber on a weight basis; it requires recalculation of the segment reinforcement from the tensile stress-crack opening relation obtained under EN 14651:2007 or a project-specific direct tension test. Published data for MasterFiber MAC 360 in this specific precast segment configuration is limited, so the segment supplier must conduct a preliminary batching, curing, and demoulding trial before production acceptance.
Competitive MasterFiber MAC 360 - Structural Macro Synthetic Fiber prices that fit your budget—flexible terms and customized quotes for every order.
For samples, pricing, or more information, please contact us at +8618112911328 or mail to sales1@liwei-chem.com.
We will respond to you as soon as possible.
Tel: +8618112911328
Email: sales1@liwei-chem.com
Flexible payment, competitive price, premium service - Inquire now!
MasterFiber MAC 360 is a structural macro synthetic fibre supplied as an embossed monofilament and introduced into concrete, shotcrete, and precast matrices where post-crack residual capacity is required. The fibre is produced from a polyolefin blend with a nominal specific gravity of 0.91 and a nominal length of 54 mm. It falls within the scope of ASTM C1116/C1116M Type III synthetic fibre-reinforced concrete and is classified for structural use under EN 14889-2. In slab-on-ground construction the fibre is used to replace welded wire mesh and light steel fabric at dosages between 1.8 kg/m³ and 7.5 kg/m³, depending on the required residual strength class. In comparison with steel fibres, the polyolefin monofilament is non-corroding, non-magnetic, and approximately 88% lower in density, which raises fibre count per kilogram but reduces stiffness and post-crack stress at wider crack openings. The product is not designed to replace primary flexural steel in continuous beams or suspended slabs; its structural contribution is the transfer of tensile stress across a cracked concrete matrix after first cracking.
Technical data used in concrete mix design should distinguish between fibre base properties and composite performance. The values below are typical published values and should be verified against the manufacturer’s certificate for the production lot. Published data for the specific pull-out bond-slip relationship of the embossed monofilament in C30/37 concrete is limited, so structural qualification programs normally rely on flexural toughness testing rather than single-fibre pull-out.
| Property | Typical value | Test method/reference |
|---|---|---|
| Specific gravity | 0.91 | ASTM D792 |
| Nominal length | 54 mm | Manufacturer lot control |
| Nominal diameter | 0.8 mm | Manufacturer lot control |
| Tensile strength | >600 MPa | ASTM D2256 |
| Elastic modulus | 9.5 GPa | ASTM D638 |
| Melting point | 162 °C | DSC |
| Water absorption | <0.1% | ASTM D570 |
The aspect ratio is approximately 67. At this geometry, the fibre distributes with acceptable pumpability in wet-mix shotcrete up to 6 kg/m³ through a 50 mm nominal hose diameter. The stored fibre is packaged in degradable paper bags or bulk sacks, and the packaging should be kept dry. Although water absorption is below 0.1%, surface moisture can cause fibre bundles to bridge in dosing screws. The melting point of 162 °C does not represent a service temperature limit for concrete, but at temperatures above 100 °C the polymer softens and post-crack capacity should be considered ineffective in fire resistance calculations.
When welded wire mesh is deleted from a ground-supported slab, the concrete section still requires a defined residual flexural capacity after cracking. Preconstruction qualification for MasterFiber MAC 360 is normally performed by beam tests according to ASTM C1609/C1609M or EN 14651. In a concrete with compressive cylinder strength of 30 MPa to 35 MPa and a dosage of 3.0 kg/m³, residual flexural strengths at net deflection limits of L/600 and L/300 may be expected in the range of 1.0 MPa to 1.8 MPa, though exact values shift with aggregate angularity, paste volume, and fibre orientation. At 4.5 kg/m³, the equivalent flexural strength ratio may increase by 35% to 60% relative to 3.0 kg/m³, but slump loss of 50 mm to 80 mm is observed unless mid-range or high-range water-reducing admixtures are adjusted.
Production-scale twin-shaft compulsory mixers with 1.0 m³ batch capacity usually require 45 seconds to 60 seconds of wet mixing after fibre addition to eliminate visual fibre balls. In transit mixers, the drum should be charged at 12 rpm to 14 rpm for 4 minutes to 6 minutes after fibre dosing. Adding the full fibre dose as a single cluster into the charging hopper can produce bridging in the feed gate, especially with bulk-bag discharge systems. Sequential addition of half bags or pneumatic blowing through a dosing pipe reduces the occurrence of blade entanglement. The fibre should not be added to a dry mixer before coarse aggregate because the monofilaments can be forced into wear plate gaps and reduce seal life.
The replacement of mesh is limited to non-structural load transfer and to slab areas where the foundation provides continuous support. At free edges, construction joints, and column penetrations, conventional reinforcement or dowels remain necessary because a macro synthetic fibre does not provide the large crack-width control or load-transfer stiffness of continuous steel bars. Published data for this specific configuration is limited when fibre-only slabs are subjected to heavy rack point loads above 80 kN; a separate punching shear check is required.
Wet-mix shotcrete linings in underground construction use MasterFiber MAC 360 at 4 kg/m³ to 6 kg/m³ to achieve toughness classes for rock support. In dry-mix shotcrete the fibre is pre-blended with cement and aggregate before the nozzle; in wet-mix shotcrete it is added during batching and the mix is delivered to the pump. Pump selection influences fibre damage. Piston pumps with 50 mm to 65 mm delivery lines show less fibre fracture than screw-type pumps because the screw pump imparts continuous shear to the monofilament. At 6 kg/m³, a 50 mm hose diameter is the practical lower limit; blockages increase at smaller diameters, particularly when the coarse aggregate is larger than 8 mm. The in situ residual performance of sprayed concrete is not identical to cast beam data because spraying produces a preferential fibre orientation in the plane of the lining. The rebound stream is enriched in fibre relative to aggregate due to the low particle mass. Therefore, the actually retained fibre content should be verified by washout testing on fresh sprayed concrete or by core extraction and visual counting. Batched weight alone can overstate in-place fibre content by 10% to 25% in overhead spraying.
At the nozzle, compressed air pressure of 0.4 MPa to 0.6 MPa and a water-to-cement ratio below 0.45 are used to control rebound. The presence of the fibre does not significantly alter accelerator dosage, but mixes with fibre are stiffer after acceleration, making manual finishing more difficult. No chemical incompatibility with set accelerators has been recorded in field use, but surface embossing can trap paste and produce a more porous interfacial transition zone. Fibre balling in the nozzle is more associated with bent delivery hoses or a worn nozzle tip than with fibre geometry.
In precast segment production, MasterFiber MAC 360 is added at 2.5 kg/m³ to 4.5 kg/m³ to reduce edge chipping and handling damage. External vibrators compact the mix. Thin sections below 50 mm tend to orient fibres with the flow, and trial castings are required to set the maximum dosage for a given mould. A maximum coarse aggregate size of 10 mm may be specified above 4 kg/m³ to prevent fibre accumulation around blockouts.
Alkali-free accelerators based on aluminium sulfate are commonly used with macro synthetic fibre shotcrete for tunnel and mine applications. The accelerator dose is typically 6% to 10% by mass of cement. At these doses, the open time after nozzle discharge is reduced to 2 minutes to 5 minutes, and the mix hardens with a fine-grained ettringite-rich matrix. MasterFiber MAC 360 does not react chemically with the accelerator and remains stable in the alkaline pore solution. However, the rapid viscosity increase can immobilize fibre clusters before full dispersion if the fibre is added too late in the mixing sequence. The recommended addition point is at the batch plant, not in the truck at the shaft, because late addition may result in a reduction in measured residual strength of 20% to 30%. This is a mixing-order limitation, not a chemical incompatibility. In underground lining jobs, batching records should record fibre addition time and drum revolutions before pump discharge to control this variation.
The compatibility with chlorinated water and sulfate-bearing groundwater is governed by the concrete matrix and not by the polyolefin fibre. The fibre does not participate in chloride-induced corrosion, and no passivation or cathodic protection interaction is required. This distinguishes the product from steel fibres in marine or chloride-laden service. However, in high-temperature fire endurance, the polymer will melt and leave channels in the concrete. If the section is required to maintain post-crack capacity after fire, a hybrid system with steel fibres or conventional reinforcement should be considered.
Fresh concrete fibre content can be checked by the washout procedure referenced in EN 14889-2. A representative sample of 20 kg to 30 kg of fresh fibre-reinforced concrete is washed over a 5 mm sieve; the retained fibres are dried and weighed. The result is compared with the intended dosage in kg/m³ using the known fresh density of the concrete. A deviation greater than ±10% from the target may indicate a batching calibration error or fibre loss in the charging system. For hardened concrete, saw-cut surfaces can be photographed and fibres counted per unit area, but this method is orientation-dependent and may underestimate fibres aligned perpendicular to the cut plane. The relationship between surface fibre count and three-dimensional dosage should be established for each mix design.
In floor slabs, bull-floating and power-trowelling orient a proportion of fibres into the horizontal plane. This changes the relationship between ASTM C1399/C1399M beam specimens and actual floor performance. Beams prepared by consolidation with a vibrator may show a more vertical orientation than trowelled floors. For performance verification, specimen preparation should follow the same placing and finishing method as the production slab. The use of round panel tests per ASTM C1550 or square panel tests per EN 14488-5 is recommended for sprayed concrete because the panel geometry better represents fibre orientation in a sprayed lining.
| Requirement | Applicable standard | Relevance |
|---|---|---|
| Type III synthetic fibre-reinforced concrete | ASTM C1116/C1116M | Classification for synthetic macro fibre |
| Fibres for structural use | EN 14889-2 | CE marking for structural fibres |
| Post-crack flexural performance | ASTM C1609/C1609M | Residual strength at specified deflections |
| Residual strength of synthetic fibre concrete | ASTM C1399/C1399M | Average residual strength from cracked beam |
| Sprayed concrete panel energy absorption | EN 14488-5 | Panel test for shotcrete toughness |
Compared with cold-drawn steel fibres, MasterFiber MAC 360 has a lower elastic modulus of 9.5 GPa versus approximately 210 GPa for steel. At the same volume fraction, steel fibres mobilize higher residual stress at crack widths above 0.5 mm, while macro synthetic fibres are more compliant and may require a higher dosage to achieve equivalent crack-width control. The density difference, 0.91 versus 7.85 g/cm³, produces a much higher number of individual fibres per kilogram. This closer fibre spacing contributes to early crack control but does not change the elastic modulus of the uncracked concrete. Steel fibres can corrode at exposed surfaces and can interfere with magnetic induction reading of concrete cover. Macro synthetic fibres are non-magnetic and do not produce surface staining.
Compared with micro polypropylene fibres, which are typically 6 mm to 19 mm long and dosed at 0.6 kg/m³ to 1.2 kg/m³, MasterFiber MAC 360 is not intended solely for plastic shrinkage control. Micro fibres reduce surface bleed and early plastic settlement cracking; they have limited influence on hardened concrete toughness because their short length cannot bridge wider structural cracks. Macro synthetic fibres are not a substitute for air-entraining admixtures in freeze-thaw durability, nor a substitute for proper curing. The combined use of micro and macro synthetic fibres is permissible and sometimes specified for separate crack-control stages, but the total synthetic volume should be considered in mix design to avoid excessive slump loss.
The distinction from welded wire mesh and steel rebar is primarily placement reliability. Mesh is positioned at a specified depth and can be displaced during concrete placement, lowering its structural value. Fibre reinforcement is distributed throughout the concrete matrix at the time of mixing, but its orientation is affected by placement and finishing. This creates a different failure mechanism: distributed fibre bridging rather than discrete bar yield. In slab design, the two systems are not interchangeable in all load cases. The fibre option becomes viable where the load is distributed, the substrate is uniform, and crack widths are limited to serviceability thresholds. At concentrated loads, joints, or structural connections, bar reinforcement remains mandatory.
Within the macro synthetic fibre category, products differ by length, diameter, and surface treatment. MasterFiber MAC 360 uses a 54 mm length and embossed surface. Shorter macro fibres around 38 mm to 48 mm may disperse more easily in low-workability mixes but provide lower post-crack resistance at larger crack widths. Longer fibres above 60 mm may improve anchorage but increase the risk of balling in small hose diameters and congested formwork. The specific configuration of 0.8 mm diameter and 54 mm length is positioned for structural slab and shotcrete applications where pumpability and post-crack toughness must be balanced.
In concrete exposed to cyclic wetting and drying with chlorides, crack width limits govern the serviceability design. MasterFiber MAC 360 is used at 3 kg/m³ to 5 kg/m³ in slabs and walls to provide crack-width control after thermal and shrinkage loading. The fibre does not decrease the chloride diffusion coefficient determined by NT Build 443 or ASTM C1556, but it can reduce the continuity of shrinkage cracks that act as chloride ingress paths. In a crack width calculation under EN 1992-1-1, the contribution of macro fibre in the uncracked phase is not included; in the post-crack phase the residual tensile stress is used in the serviceability check. The exact residual stress value should be established by EN 14651 at the specified crack mouth opening displacement.
For XS2 marine splash exposures, the dosage should be selected from site-specific preconstruction testing rather than a default table. The fibre alone does not protect embedded steel from chloride-induced corrosion if the concrete cover is underspecified. In this context it is an auxiliary measure for crack control, not a corrosion protection system.