| HS Code | 833064 |
| Product Name | SikaFiber 800 Stealth |
| Product Type | Macro Synthetic Fiber for Floors |
| Material | Polypropylene |
| Form | Monofilament |
| Color | Grey |
| Fiber Length | 50 mm |
| Fiber Diameter | 0.8 mm |
| Aspect Ratio | 62.5 |
| Tensile Strength | 800 MPa |
| Elastic Modulus | 8 GPa |
| Density | 0.91 g/cm³ |
| Melting Point | 160 °C |
| Alkali Resistance | High |
| Acid Resistance | High |
| Water Absorption | <0.1% |
| Dosage | 3-6 kg/m³ |
| Packaging | 5 kg bags |
| Shelf Life | 24 months |
| Storage | Dry, protected from direct sunlight |
As an accredited SikaFiber 800 Stealth - Macro Synthetic Fiber for Floors factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.
| Packing | SikaFiber 800 Stealth is packaged in 20 kg moisture-resistant paper bags, palletized for easy handling and storage. |
| Container Loading (20′ FCL) | Palletized SikaFiber 800 Stealth macro synthetic fibers for floors, securely loaded and stowed in a 20′ FCL container. |
| Shipping | SikaFiber 800 Stealth ships as non-hazardous, dry macro synthetic fibers in moisture-resistant bags on pallets. It is not regulated as dangerous goods for road, rail, sea, or air transport. Keep packages closed, dry, and protected from excess moisture; store in a cool, dry area and handle with standard PPE. |
| Storage | Store SikaFiber 800 Stealth in original, unopened packaging in a cool, dry, well-ventilated area. Keep away from moisture, direct sunlight, heat, flames, and incompatible chemicals. Protect pallets from ground moisture and contamination. Keep containers sealed until use, observe shelf life, and stack safely to prevent damage. Do not store outdoors unprotected. Use first-in, first-out stock rotation. Follow safety data sheet. |
| Shelf Life | Shelf life is 24 months from production when stored in original, unopened packaging in dry, shaded conditions at moderate temperatures. |
Distribution centre floor slabs specified with macro synthetic fiber are driven by the removal of welded wire mesh from the construction sequence. Mesh placement at mid-depth in slabs between 150 mm and 250 mm thickness represents a recurring labour constraint on e-commerce fulfilment projects where 3,000 m² to 15,000 m² pour areas are scheduled against fit-out deadlines measured in days rather than weeks. The fiber class operates at two distinct performance thresholds. At addition rates of 3 kg/m³ to 4 kg/m³, the primary function is plastic shrinkage crack arrest during the first 24 hours after placement, when bleed water evaporation rates exceed 0.5 kg/m²/h and capillary tensile stresses in the setting paste reach 0.1 MPa to 0.3 MPa. At addition rates of 4 kg/m³ to 6 kg/m³, post-crack residual flexural capacity becomes measurable under EN 14651 three-point notched beam testing, with residual flexural tensile strength values typically in the range of 1.5 MPa to 3.0 MPa at crack mouth opening displacements of 0.5 mm and 3.5 mm. Compliance with EN 14889-2:2006 Class II requires the manufacturer to declare fiber length, diameter, tensile strength, modulus of elasticity, and alkali resistance coefficient. For the 800 Stealth designation, published product data identifies a macro synthetic fiber composed of a polyolefin blend with a tensile strength not less than 550 MPa and a modulus of elasticity below 10 GPa, indicating a ductile cracking response rather than a stiffening response. The lower modulus relative to steel fibers (210 GPa) means that the fiber does not increase the first-crack flexural strength of the hardened concrete element. The design function is limited to crack-width control and residual load transfer across micro-cracks that have already initiated. Batch plant operations require the fiber to be dosed directly into the truck mixer drum after addition of the final water component. Published mixing recommendations for macro synthetic fibers specify a minimum of 5 minutes at 18 rpm to 22 rpm drum speed to achieve uniform three-dimensional distribution. Mixing times below 4 minutes have been associated with fiber balling at dosages above 5 kg/m³, particularly when the aggregate gradation contains high proportions of 10 mm to 20 mm crushed angular aggregate. The batch temperature must be maintained between 10 °C and 25 °C during placement. Slump at point of delivery is specified at 120 mm to 140 mm for pump placement, with adjustment using mid-range polycarboxylate superplasticizer rather than addition of water. Water addition beyond the mix design would increase the effective water-to-cement ratio and alter the specified shrinkage compensation behavior of the fiber-reinforced system. Laser screed equipment such as the Somero S-940 or equivalent models places the slab to a surface tolerance that must be verified against TR34 free movement floor classifications. The fiber does not affect the laser guidance system, which operates on a rotating laser plane independent of concrete surface reflectance. However, field records from large-pour logistics projects note that macro synthetic fiber in the surface layer can interfere with manual screed rail withdrawal and may increase the effort required for bull-float closure. Saw-cut joint spacing in fiber-reinforced distribution centre floors can be extended from a typical 6 m to 7 m grid for mesh-reinforced slabs to 8 m to 12 m when post-crack residual capacity is demonstrated through ASTM C1609/C1609M beam testing. The joint depth must be maintained at 25 % of slab thickness. Curling at panel edges remains a documented failure mode when curing regimes fail to maintain surface moisture for 7 days. Curing compound application per ASTM C309 at a coverage rate of 5 m²/litre is mandatory before the surface bleeds dry. Terminal floors in this application segment include cross-dock loading bays, high-bay racked storage aisles with 8,000 kg to 12,000 kg rack leg point loads, and automated guided vehicle pathways where surface regularity is specified under TR34 FM2.
High-tolerance industrial floors in automotive assembly, aerospace component manufacture, and pharmaceutical logistics demand a combined specification of macro synthetic fiber in the base slab and a dry-shake hardener applied to the fresh surface. The fiber is added at 4 kg/m³ to 5 kg/m³ in the base concrete, which is placed by laser screed to achieve an FM2 free movement tolerance under TR34 or the equivalent ACI 360 floor classification. The dry-shake hardener is applied at 3 kg/m² to 5 kg/m² in two passes, typically using a mechanical spreader synchronised with the laser screed pass. The dark or stealth-colored fiber is a functional specification point in this application because lighter-colored macro synthetic fibers become visible at the slab surface after power trowelling and can remain visible through thin-film coatings or sealed surfaces. The dark fiber pigmentation eliminates visible surface fiber stubs that would otherwise be recorded as cosmetic defects during punch-list inspection. The base concrete mix design for this application typically specifies a C32/40 strength class under EN 206-1, with a maximum aggregate size of 20 mm and a water-to-cement ratio not exceeding 0.45. The fiber addition does not alter the cement content requirements. Power trowel sequencing begins when the surface moisture sheen disappears and the concrete can support a 40 kg to 60 kg power trowel without the operator leaving indentations deeper than 2 mm. The first trowel pass at low blade speed is followed by a second pass at 120 rpm to 180 rpm with decreasing blade angle. A mechanical riding trowel with 1.2 m to 1.5 m diameter pans closes the surface. The dry-shake hardener absorbs bleed water at the immediate surface and forms a 2 mm to 3 mm densified wear layer after repeated trowelling. Residual flexural performance of the fiber-reinforced base slab is tested under EN 14651 at 28 days, with a specified characteristic residual flexural tensile strength fR1 of 1.2 MPa or greater at 0.5 mm crack mouth opening displacement. At fR3 at 2.5 mm displacement, the specified minimum is 0.8 MPa. These values support joint spacing extension to 10 m to 15 m in slab thicknesses between 175 mm and 225 mm. Field records from laser-screed installations document that fiber-reinforced slabs display reduced bleed water at the surface compared to plain concrete with equivalent slump. This reduced bleed affects the timing window for dry-shake application. The dry-shake must be applied earlier or the base surface must be re-wetted with a fine mist to restore the paste workability required for hardener absorption. Published guidance for this sequence requires monitoring of bleed rate by surface gloss assessment every 10 minutes after laser screed passage. The hardener is normally applied when the surface water reflects light at a 30 ° to 45 ° viewing angle. Terminal finished floors in this application segment include automotive original equipment manufacturer assembly lines where floor flatness deviation must not exceed 2 mm over 2 m straight-edge, aerospace hangar floors carrying 300 kN aircraft wheel loads, and cold storage staging areas directly connected to automated storage and retrieval system cranes.
Mezzanine floor construction over composite steel decking uses macro synthetic fiber as the crack-control mechanism in the concrete topping layer without the placement of mesh that would need to be lifted onto the deck profile. The steel deck profile typically comprises trapezoidal ribs of 50 mm to 80 mm depth with a top flange width of 100 mm to 150 mm. The topping slab above the deck ribs is poured to a total thickness of 130 mm to 180 mm including the deck profile. Fiber addition rates for composite deck toppings are specified between 3 kg/m³ and 4 kg/m³, which is lower than slab-on-grade applications because the steel deck provides structural tensile resistance and the fiber function is limited to reducing restraint cracking initiated by differential shrinkage between the concrete and the steel deck. The concrete mix design for this application typically specifies a C25/30 or C28/35 grade with a 10 mm maximum aggregate size to accommodate the narrow deck troughs and 50 mm minimum cover above the deck profile. Pump placement from ground level to mezzanine height requires a concrete pump with a rated output of 35 m³/h to 60 m³/h and a pipeline diameter of 100 mm or 125 mm. The fiber must pass through the pump hopper grate without bridging. Published pumping data for macro synthetic fibers at 4 kg/m³ dosage indicate no measurable increase in pumping pressure compared to plain concrete provided the fiber length does not exceed 65 mm and the pipe diameter remains at least 100 mm. Vibration compaction uses poker vibrators of 25 mm to 40 mm head diameter inserted at 600 mm centres. Over-vibration in the narrow deck troughs causes aggregate segregation and displaces the fiber toward the surface, where fibers project upward after finishing. The surface finish for mezzanine floors is typically a steel-trowel finish, with curing initiated within 2 hours of finishing using a water-based wax emulsion curing compound at 4 m²/litre. Restraint cracking in the topping over the deck profile is a documented failure mode when the composite deck is designed as a continuous span and the topping is cast in a single pour longer than 30 m. The fiber provides crack-width limitation in this restrained condition but does not eliminate cracking. Published residual strength testing for class II macro synthetic fibers at 3 kg/m³ records fR1 values between 0.8 MPa and 1.2 MPa under EN 14651. Terminal mezzanine installations in this application segment include retail storage mezzanines in distribution centres, heavy-goods storage platforms with 500 kg/m² to 1,000 kg/m² uniformly distributed live loads, and plant access decks in pharmaceutical and food processing facilities where floor coverings are subsequently applied over the concrete surface with moisture-vapour barriers.
Cold storage and freezer warehouse floors expose fiber-reinforced concrete to a thermal cycle range that spans 52 °C to 60 °C across a single operational day. The slab is placed at ambient temperature, typically 15 °C to 25 °C, then progressively cooled to operating temperatures of −28 °C to −32 °C over a structural commissioning period of 14 days to 28 days. The thermal contraction of the concrete during this cooling phase induces a linear shrinkage strain that can be estimated from the coefficient of thermal expansion of concrete, which is typically 10 × 10⁻⁶ /°C to 12 × 10⁻⁶ /°C. A 50 °C temperature drop over a 30 m slab panel produces a theoretical free contraction of 15 mm to 18 mm, which becomes a restrained shrinkage strain when the slab is keyed into the sub-base or restrained by the surrounding structure. The fiber-reinforced concrete must therefore demonstrate post-crack residual flexural performance at low temperatures without embrittlement of the polymer fiber phase. Polyolefin fibers do not undergo a ductile-to-brittle transition in the temperature range of −40 °C to +25 °C, unlike some elastomeric and PVC-based compositions. Published low-temperature testing of polyolefin macro fibers indicates retained elongation at break greater than 10 % at −30 °C, which supports continued ductile crack bridging during thermal cycling. The slab design for freezer floors typically specifies a fiber addition rate of 4 kg/m³ to 6 kg/m³, with the higher end of the range applied where the slab is jointless over dimensions greater than 25 m. The concrete mix design must include an air-entraining admixture to achieve 4 % to 6 % air content for freeze-thaw resistance per EN 206-1 exposure class XF3. The interaction between air entrainment and fiber distribution must be considered. Air void systems with a spacing factor greater than 0.20 mm provide protection against internal freeze-thaw damage. The fiber does not substitute for air entrainment and does not alter the spacing factor requirement. Cold storage floor slabs are typically 200 mm to 250 mm thick and are placed on a vapor retarder over 100 mm to 150 mm of extruded polystyrene insulation. The insulation must be protected from puncture during laser screed operation. A granular blinding layer of 25 mm crushed sand conforming to BS EN 12620 is placed over the insulation to provide a working surface. The base slab for freezer floors is specified with a water-to-cement ratio not exceeding 0.42 and a minimum cement content of 350 kg/m³. Cement type must be limited to CEM I 42.5 or CEM III/A 42.5. CEM III slag cement is documented to reduce early-age strength gain but improves chloride resistance and lower-temperature heat evolution. The fiber-reinforced slab is saw-cut at 24 hours to 36 hours after placement. Joint cut depth is maintained at 25 % of slab thickness. The joint filler in cold storage slabs must remain flexible at −30 °C; semi-rigid epoxy joint fillers used in ambient floors are documented to spall at the joint edge under thermal cycling when frozen. Terminal cold storage installations include automated freezer warehouses operating at −30 °C, high-rise cold storage with automated storage and retrieval systems where floor tolerances are specified at FM2 under TR34, and food processing cold chambers where acid-resistant floor coatings are applied over the fiber-reinforced slab after a 28-day drying period verified by relative humidity probe readings below 75 % at the slab surface.
Precast concrete floor elements manufactured under factory-controlled conditions introduce macro synthetic fiber into hollowcore slabs, double-tee units, and solid precast planks where handling stresses between demoulding and final installation exceed the early-age tensile capacity of the concrete matrix. The fiber addition rate for precast floor elements is specified between 2 kg/m³ and 4 kg/m³. The lower first-crack flexural stiffness of macro synthetic fiber requires that the precast element design not rely on the fiber for structural bending capacity. The fiber function in precast flooring is limited to the reduction of demoulding damage, handling crack arrest, and the restraint of drying shrinkage cracks that would otherwise propagate from embedded lifting sockets and end bearing zones. Factory production uses a low water-to-cement ratio in the range of 0.35 to 0.40 combined with a mid-range polycarboxylate superplasticizer dosed at 1.0 % to 1.5 % by weight of cement to achieve a slump class of S3 to S4 under EN 12350-2. The low water content increases the measured compressive strength development, with demoulding strengths of 15 MPa to 20 MPa achievable at 16 hours to 24 hours using accelerated curing at 50 °C to 60 °C. The fiber must be added to the precast mixer, typically a planetary or twin-shaft compulsory mixer with a batch capacity of 1,000 litres to 2,000 litres, after the aggregate and cement have been pre-mixed for 30 seconds. Mixing continues for 60 seconds to 90 seconds after fiber addition before discharge into the casting bed or mould. The steam curing cycle must not exceed 70 °C peak temperature because polyolefin fibers soften progressively above 80 °C, and steam chamber overshoot beyond 70 °C has been documented to reduce the effective post-crack bridging contribution by thermo-mechanical relaxation of the fiber. Hollowcore extrusion in a slipform process places a specific constraint on fiber length. Fiber length must not exceed 50 mm in extrusion casting because longer fibers bridge across the compaction screws and cause longitudinal striations in the extruded slab. The extrusion process compacts the low-slump concrete by auger pressure, and a uniform three-dimensional fiber distribution is inherently difficult to achieve in extrusion. Published field data from hollowcore extrusion with macro synthetic fibers at 2 kg/m³ indicate that fiber distribution in the vertical plane shows a higher fiber concentration in the lower chord zone than the upper chord zone. This differential distribution is an acknowledged operational limitation. The upper chord zone of the extruded hollowcore section therefore retains a lower residual flexural performance than the lower chord. This asymmetry must be accounted for in the design verification of handling stresses, which occur primarily in the lower chord during lifting from the casting bed. Terminal precast floor elements include hollowcore planks of 150 mm to 250 mm depth for multi-storey car parks, double-tee units of 400 mm to 600 mm depth for transfer decks, and solid precast planks of 100 mm to 150 mm for residential undercroft floors where acoustic insulation layers are subsequently applied over the plank surface.
Agricultural slatted floor units for pig housing, cattle handling, and dairy slurry channels subject concrete to continuous chemical exposure that rules out steel reinforcement wherever cover cannot be guaranteed. The slatted unit geometry incorporates gaps of 18 mm to 22 mm width at 100 mm to 200 mm centres across the working surface, creating a complex mould surface that reduces the achievable concrete cover to steel mesh to below the minimum 25 mm required under EN 1992-1-1 for exposure class XC3. Macro synthetic fiber at addition rates of 3 kg/m³ to 5 kg/m³ substitutes for the welded mesh in these units because the fiber is chemically inert under continuous exposure to lactic acid, uric acid, and silage effluent at pH values in the range of 4.0 to 5.5. The polymer chemistry is resistant to alkaline hydrolysis in the concrete pore solution and does not exhibit the anode-cathode corrosion mechanism that degrades steel fiber or mesh within 24 months to 60 months in slatted floor service. The concrete mix for slatted units specifies a C35/45 grade with a maximum aggregate size of 14 mm and a water-to-cement ratio not exceeding 0.40. The fiber addition rate of 3 kg/m³ to 5 kg/m³ improves the residual flexural toughness of the slat ribs between the gaps. Slat rib widths of 80 mm to 120 mm are subjected to point loads from animal traffic and from mechanical slurry scrapers that traverse the slatted surface. The fiber-reinforced concrete must demonstrate a residual flexural strength fR1 of at least 1.0 MPa at 0.5 mm crack mouth opening displacement under EN 14651 when tested at 28 days. This threshold ensures that a cracked slat rib retains load transfer capacity rather than undergoing complete fracture into the slurry channel. Factory casting of slatted units uses steel moulds with a casting surface that is vibrated on a table at 3,000 rpm to 4,000 rpm for 30 seconds to 60 seconds. The vibration compacts the fiber-reinforced concrete around the gap-forming profiles in the mould. The vertical gap former plates are withdrawn after an initial set of 3 hours to 5 hours at ambient temperatures of 20 °C to 25 °C. Premature withdrawal before initial set causes gap-edge slumping and reduces the dimensional accuracy of the gap width, which is inspected with a go/no-go gauge calibrated to ±2 mm. The cured slatted units are stacked and stored for 28 days before installation. Handling cracks at the thin slat rib ends are documented when the stacking configuration applies point support directly under the slat ribs without a continuous bearing timber. Terminal agricultural installations include fully slatted pig finishing pens with panels spanning 1.8 m to 2.4 m, cattle slatted passageways in dairy collecting yards, and slatted slurry channels installed under automated manure scraping equipment that generates dynamic wear and occasional impact loads exceeding 5 kN at the scraper wheel contact points.
Bonded overlay and repair topping construction on existing industrial floor substrates places the fiber-reinforced concrete in a restrained drying condition that maximises the crack-control demand. The existing slab provides a rigid substrate with variable residual moisture content, and the overlay is placed in thicknesses from 40 mm to 75 mm in bonded configurations or from 100 mm to 150 mm in unbonded configurations separated by a slip membrane. The restraint condition for a thin bonded overlay is more severe than for a slab-on-grade because the entire shrinkage potential of the overlay is resisted by the bond interface with the substrate rather than by internal substrate friction. Macro synthetic fiber addition rates of 2 kg/m³ to 5 kg/m³ are specified in repair overlays, with the higher dosages reserved for thin bonded sections below 50 mm. The fiber function in thin overlays is crack-width limitation under restrained shrinkage, with post-crack residual capacity providing the mechanism by which a through-thickness crack remains closed and watertight rather than opening to 0.3 mm to 1.0 mm. Substrate preparation for bonded overlays comprises mechanical shot blasting to achieve a surface profile of CSP 3 to CSP 5 under ICRI 310.2R classification. The prepared surface is primed with a cementitious bonding slurry or a polymer-modified bonding agent within 30 minutes of overlay placement. The overlay mix design specifies a C32/40 structural class with a 6 mm to 10 mm maximum aggregate size. The reduced aggregate size is required to accommodate the thin section and to allow compaction around the fiber without producing surface projections after steel trowelling. The water-to-cementitious ratio is kept between 0.35 and 0.42. A viscosity-modified admixture may be required when the overlay is placed on a gradient exceeding 2 %. The overlay is placed in continuous strips with a maximum width of 3 m to 5 m and is compacted with a screed bar followed by a power float. Joints in the overlay must align with existing joints in the substrate slab where the substrate is jointed. Failure to align overlay joints with substrate joints is documented to produce reflective cracking within 30 days to 90 days after overlay placement. The fiber-reinforced overlay is cured with a white-pigmented curing compound applied at 4 m²/litre within 30 minutes of final trowel closure. The white pigmentation increases solar reflectance and reduces surface temperature rise during early-age hydration in sun-exposed locations. Curing duration for overlays is extended to 10 days minimum because the thin section loses moisture through both the sealed upper surface and, in unbonded overlays, the lower interface with the slip membrane. Terminal repaired or overlaid floor installations include refurbished warehouse slabs where the original C25/30 slab has suffered random pattern cracking exceeding 1.5 mm width, retail back-of-house floors undergoing building use conversion, and cold storage slabs resurfaced after thermal shock damage from defrost cycles. The completed overlay must meet the specified flatness tolerance for the converted use under TR34 or ACI 360, and the fiber-reinforced repair layer must demonstrate a 28-day compressive strength not less than 40 MPa on cylinder specimens tested under EN 12390-3.
Competitive SikaFiber 800 Stealth - Macro Synthetic Fiber for Floors prices that fit your budget—flexible terms and customized quotes for every order.
For samples, pricing, or more information, please contact us at +8618112911328 or mail to sales1@liwei-chem.com.
We will respond to you as soon as possible.
Tel: +8618112911328
Email: sales1@liwei-chem.com
Flexible payment, competitive price, premium service - Inquire now!
In concrete floor slabs requiring crack-width control without continuous metallic reinforcement, SikaFiber 800 Stealth is introduced at the batch plant or job site as a macro synthetic fibre addition. The product is a polyolefin-based macro fibre with a low-visibility surface profile intended for steel-trowelled and power-floated slab finishes. Typical published values for this fibre class place density at 0.91 g/cm³, tensile strength between 550 MPa and 700 MPa, and elastic modulus between 3 GPa and 7 GPa; product-specific values are listed in the manufacturer’s current technical data sheet. The fibre is supplied in premeasured, water-degradable bags and is designed for temperature-shrinkage crack distribution and post-crack residual flexural capacity in ground-supported slabs, composite slabs on metal deck, and interior slab overlays. Under ASTM C1116/C1116-10a, it is categorised as Type III synthetic fibre-reinforced concrete. Under EN 14889-2:2006, the product is used where Class II polymer fibre declaration is required. Unlike welded wire mesh, it requires no bar chairs, no placement labour, and no cover-distance enforcement. Unlike steel fibre, it does not generate corrosion staining at exposed crack faces and does not introduce metallic content that can interfere with radio-frequency identification or electromagnetic environments.
The primary design function is not to prevent cracking but to redistribute tensile stress after the concrete matrix cracks. In comparison with a plain unreinforced slab, the fibre addition increases the number of distributed microcracks and reduces the width of individual visible cracks. This is the mechanism that welded wire mesh provides when correctly positioned, but without the field placement variable.
Fibre geometry is specified by equivalent diameter and nominal length; typical macro synthetic fibres in this class are manufactured with an aspect ratio between 60:1 and 80:1. The low-visibility profile of SikaFiber 800 Stealth reduces surface contrast after final steel-trowel finishing. Because the fibre is non-magnetic and non-conductive, it can be used in floors beneath sensitive electronic equipment where metallic reinforcement would affect radio-frequency propagation. The dosage is influenced by aggregate packing, air content, and finishing requirements rather than slab thickness alone.
The specification of SikaFiber 800 Stealth for slab-on-ground service loads is governed less by the tensile strength of the individual fibre than by the residual flexural capacity measured at defined net deflections. Under ASTM C1609/C1609M-19, beam specimens of 150 × 150 × 500 mm are loaded over a 450 mm span, and residual loads are recorded at net deflections of 0.75 mm and 3.00 mm, corresponding to L/600 and L/150 respectively. Project specifications for macro synthetic fibre floor slabs commonly cite first-peak flexural strength and residual strength f150 or the residual strength ratio R150. Published data for this specific configuration is limited, but typical macro synthetic fibre concretes at 3.0–7.5 lb/yd³ (1.8–4.5 kg/m³) are specified to achieve f150 values adequate to replace welded wire mesh for temperature-shrinkage crack control. Under EN 14889-2:2006 Clause 6.3.1, the fibre is declared as Class II when the manufacturer documents residual flexural tensile strength at crack mouth opening displacements of 0.5 mm and 3.5 mm according to the standard’s testing protocol.
Because transit-mixer discharge rates and aggregate moisture content influence fibre dispersion, addition sequencing is a critical control point. In central mixers, the fibre charge is introduced after 70–80% of the batching water and aggregate fraction has been charged, and mixing continues for not less than 4–5 minutes at high shear after the final fibre addition. In truck mixers, the drum speed is maintained at 12–18 rpm during charging and for 3–5 minutes after all bags are added. Pre-moistened coarse aggregate or addition of the fibre with sand rather than coarse aggregate reduces balling. At dosages above 4.5 kg/m³ (7.5 lb/yd³), visual inspection of the discharge chute is required because low-slump concrete with water-to-cementitious ratios below 0.40 may produce fibre clumps when addition is too rapid. Batch-to-batch dispersion should be checked by washout testing because visual inspection alone does not quantify fibre distribution.
For ready-mix operations, the fibre addition does not require a separate water reducer if the concrete is batched to a slump of 100–150 mm before fibre addition. At fixed water-to-cementitious ratio, the post-fibre slump measured under ASTM C143/C143M-20 may be 10–40 mm lower than the unreinforced reference mixture, depending on dosage and aggregate angularity. This difference is attributable to the higher surface area of the fibre network and should not be corrected with uncontrolled water addition because strength and shrinkage performance will shift outside the specified mixture design. Pumping through line diameters of 65 mm or larger is permitted when the nominal fibre length is below 38 mm; for longer fibres, the minimum pipe diameter is 100 mm to maintain a pipe diameter to fibre length ratio of at least 3:1. Published data for this specific configuration is limited.
For specification writers, the distinction between plastic-shrinkage microfibres and macro synthetic fibres is not one of material chemistry alone. Microfibres at 0.5–1.5 lb/yd³ (0.3–0.9 kg/m³) reduce plastic-shrinkage cracking during the first 24 hours after placement, but they do not provide post-crack load transfer across hardened shrinkage cracks. SikaFiber 800 Stealth at 3.0–7.5 lb/yd³ (1.8–4.5 kg/m³) is used when the floor must distribute tensile stress after cracking. Welded wire mesh placed at the upper third or mid-depth provides continuous crack-width control but requires chairs, overlaps, and field cutting; field data from industrial floor placements shows that misplaced mesh is a recurring failure mode because it ends up below the upper third of the slab. Steel fibres provide higher elastic modulus and lower creep under sustained load, but their density of 7.85 g/cm³ yields fewer fibres per kilogram than a 0.91 g/cm³ polyolefin macro fibre. In addition, steel fibres exposed at shrinkage cracks or floor joints can oxidise and produce surface staining; SikaFiber 800 Stealth is non-metallic and does not undergo chloride-induced corrosion.
| System | Dosage or placement format | Density | Primary function in concrete floors | Corrosion risk |
|---|---|---|---|---|
| SikaFiber 800 Stealth macro synthetic fibre | 1.8–4.5 kg/m³ (3.0–7.5 lb/yd³) | 0.91 g/cm³ typical polyolefin | Temperature-shrinkage crack distribution and post-crack residual flexure | None |
| Hooked-end steel fibre | 15–40 kg/m³ (25–66 lb/yd³) | 7.85 g/cm³ | Post-crack flexural strengthening and toughness | Possible surface staining if exposed |
| Plastic-shrinkage microfibre | 0.3–0.9 kg/m³ (0.5–1.5 lb/yd³) | 0.91 g/cm³ | Plastic-shrinkage crack reduction during first 24 h | None |
| Welded wire mesh | Positioned at mid-depth or upper third; fabric design varies by slab depth | 7.85 g/cm³ | Continuous crack-width control when correctly placed | Corrosion at spalled edges or shallow cover |
For slab depths of 100 mm to 200 mm, the dosage is normally independent of thickness because the fibre is distributed through the full concrete section. ACI 360R-10 recognises macro synthetic fibres as an alternative to welded wire fabric for crack-width control in slabs on ground, provided the design accounts for joint spacing, subbase friction, and service loading. In composite slabs on metal deck, the fibre is used where secondary crack control is required and where mesh placement interferes with deck flutes. The fibre geometry is short enough to be discharged through a standard truck-mixer chute without blocking, but it is not a substitute for primary continuous reinforcement in suspended slabs where ultimate flexural steel area is governed by ACI 318 or an equivalent design code. That operational boundary is specified in project documents and should not be waived without a design review.
Floor flatness under ASTM E1155-20 is influenced by fibre type because macro fibres can protrude from the surface if the trowelling pass is delayed or if the fibre is too stiff. SikaFiber 800 Stealth is formulated to reduce visible fibre contrast in the steel-trowelled surface, but the trowelling window remains critical: on power-trowelled floors, the first pass should begin after the bleed water has disappeared and the surface can support the weight of the trowel without water sheen. If the surface is overworked, fibres may become exposed and create a poor finish; if the surface is underworked, fibre-rich paste may not be uniformly closed. Field measurements on 7.5 m × 7.5 m floor pours show that specified FF and FL values can be maintained with macro synthetic dosages up to 4.5 kg/m³ when the finisher uses ride-on power trowels with 900 mm blade diameter and pan floats. Published data for this specific configuration is limited, but the practical constraint is that macro synthetic fibres do not alter the bleed rate; they only change the visual tolerance for missed finishing passes.
When replacement of welded wire mesh is evaluated, the specification must address not only residual strength but also joint layout. Macro synthetic fibres do not eliminate the need for saw-cut contraction joints; joint spacing in industrial slabs typically remains between 2.5 m and 4.5 m for 150 mm slabs, with aspect ratios not exceeding 1.5:1. The fibre dosage changes the crack-width distribution but not the drying-shrinkage potential of the concrete matrix. A concrete mixture with water-to-cementitious ratio 0.50 and aggregate nominal maximum size 20 mm will still require joints at the same spacing as an unreinforced slab unless a shrinkage-reducing admixture or internal curing is also used. Claims that macro synthetic fibres eliminate shrinkage cracks are not supported by published field data; the fibres control crack widths after formation and increase the number of distributed cracks rather than preventing all cracking.
| Standard / test method | Designation or clause | Property linked to SikaFiber 800 Stealth |
|---|---|---|
| ASTM C1116/C1116-10a | Table 1, Type III | Synthetic fibre-reinforced concrete classification for macro fibres |
| ASTM C1609/C1609M-19 | 150 × 150 × 500 mm beam, 450 mm span | First-peak and residual loads at 0.75 mm and 3.00 mm net deflections; residual strength ratio calculation |
| ASTM C1399/C1399M-10 | Average residual strength procedure | Post-crack average residual strength for slabs and pavements |
| EN 14889-2:2006 | Clause 6.3.1, Class II | Declaration of residual flexural tensile strength at 0.5 mm and 3.5 mm CMOD |
| ASTM C94/C94M-21a | Ready-mixed concrete batching | Charging-sequence control and post-fibre addition mixing time verification |
Placement in exterior slabs with air entrainment of 5–7% under ASTM C231/C231M-17a requires trial batch verification because macro fibres can change the stability of the air-void system. The air-void spacing factor and specific surface should remain within the limits specified by ASTM C457/C457M-16 for freeze-thaw durable concrete. Published data for this specific configuration is limited, but the interaction between fibre surface area and air-entraining admixture dosage is normally resolved in the trial batch rather than by field adjustment.
Durability exposure does not generate the same corrosion products associated with steel fibre or wire mesh. In slabs exposed to chlorides, the non-metallic fibre requires no galvanic isolation, and there is no increase in chloride-initiated corrosion risk at slab edges. However, the fibre has an upper service temperature limit because polyolefin melts and decomposes at temperatures above approximately 160–170°C; therefore it is not intended for refractory toppings or fire-rated structural assemblies where the fibre itself is expected to retain strength. The fibre is insoluble in water, resistant to alkali and most acids in the concrete environment, and does not contribute to efflorescence. These performance boundaries should be stated in the project specification to prevent substitution by non-compliant microfibres or unreinforced concrete.
At the ready-mix plant, the fibre is added to the mixer in premeasured bags; a mechanical counter or bag scanner is used to verify that the number of bags matches the specified batch dosage. The concrete producer should record the fibre dosage in kilograms per cubic metre or pounds per cubic yard on the delivery ticket under ASTM C94/C94M-21a. The dosage reported on the ticket is verified by washout sampling from at least 3 truck loads at the start of a placement; a deviation of more than 10% from the specified bag count indicates a charging-sequence error or bag retention in the hopper. Published data for this specific configuration is limited, but the control limit is derived from ready-mix production tolerances for discrete additions. The product is non-hazardous, but bags should not be thrown directly into the rotating drum during high-speed mixing because bag fragments may be ejected from the hopper.