| HS Code | 344513 |
| Product Name | MasterFiber 143 |
| Material | 100% virgin polypropylene |
| Fiber Type | Monofilament |
| Length | 12 mm |
| Diameter | 0.032 mm |
| Aspect Ratio | 375 |
| Tensile Strength | 350 MPa |
| Elastic Modulus | 3500 MPa |
| Density | 0.91 g/cm³ |
| Melting Point | 160-165 °C |
| Alkali Resistance | High |
| Water Absorption | Nil |
| Chemical Resistance | Excellent |
| Recommended Dosage | 0.6-1.2 kg/m³ |
| Packaging | 0.6 kg water-soluble bags, 20 kg cartons |
| Color | Natural white |
As an accredited MasterFiber 143 - Polypropylene Fiber for Reinforcement in Sprayed Concrete and Cast Concrete factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.
| Packing | MasterFiber 143 comes in 0.6 kg water-soluble bags, packed 20 bags per carton, totaling 12 kg per carton. |
| Container Loading (20′ FCL) | 20′ FCL container loading: MasterFiber 143 polypropylene fiber for sprayed and cast concrete, palletized, dry, secured for safe transport. |
| Shipping | MasterFiber 143 is typically shipped as a dry, non-hazardous polypropylene fiber in sealed moisture-resistant bags, palletized and shrink-wrapped. Transport in clean, dry vehicles; protect from moisture, punctures, and direct sunlight. Store indoors in original packaging and handle with standard PPE, avoiding dust and package damage. |
| Storage | Store in a cool, dry, well-ventilated place in original unopened packaging. Protect from moisture, direct sunlight, and extreme temperatures. Keep away from open flames, ignition sources, and incompatible materials. Elevate off floor, stack securely to prevent bag damage, and observe FIFO. Ensure good housekeeping to avoid dust and contamination. Use within recommended shelf life; reseal partially used containers. |
| Shelf Life | Shelf life: 24 months when stored dry in original unopened packaging, protected from direct sunlight and moisture. |
In dry-mix sprayed concrete tunnelling, MasterFiber 143 is introduced as a polypropylene fibre into the dry blend before cement and 0–8 mm continuous-graded aggregate enter the rotor hopper. The fibre must pass through a hopper screen with apertures no smaller than 40 mm to prevent fuzz-ball bridging; dosing systems are interlocked with the aggregate weigh-belt start signal so that fibre is not added into an empty mixer. Sprayed concrete placed under EN 14487-2:2006 for temporary rock support commonly carries a polymer-fibre addition of 4 kg/m³ to 7 kg/m³, adjusted when the specified energy absorption class is E500 or E700 under EN 14488-5:2006. The critical processing conflict is the interaction among fibre volume fraction, water/binder ratio, and dry-mix transport distance: as fibre content crosses 5 kg/m³, the apparent stiffness of the dry blend increases, sometimes reducing rotor-pot filling uniformity by 10 % to 15 % on machines fitted with rubber deflector plates. Pre-dampening of fine aggregate to 3 % to 5 % moisture supports pack stability without sacrificing discharge, but moisture above 6 % initiates lump formation around fibre bundles and can block the air gun. The terminal product is a temporary tunnel support shell or rock reinforcement layer, typically followed by a cast concrete secondary lining.
Wet-mix sprayed concrete for slope stabilisation and underground mine headings is batched as a pumpable concrete with a maximum aggregate size of 8 mm to 10 mm, then conveyed by a dual-piston shotcrete pump to a nozzle where compressed air and an alkali-free or alkali-based set accelerator are introduced. MasterFiber 143 is added at the ready-mix plant through a purpose-built fibre dispenser mounted above the aggregate belt; direct hand dumping into a rotating truck drum is not recommended because it can form roping around mixing blades at additions above 3 kg/m³. Rebound is controlled by nozzle angle of 80° to 90° to the substrate, spray distance of 1.0 m to 1.5 m, and the early yield stress of the accelerated matrix. Synthetic fibres increase the cohesiveness of plastic shotcrete but also raise pumping pressure demand: on a 30 m delivery line with a 65 mm diameter hose, pressure can rise by 0.5 MPa to 1.0 MPa at fibre contents above 4 kg/m³ compared with plain wet-mix shotcrete. The applicable conformity standard for the fibre is EN 14889-2:2006; placed shotcrete is tested according to EN 14488-3:2006 for early compressive strength and EN 14488-5:2006 for flexural energy absorption. Terminal finished products are reinforced cut slopes, portal face stabilisation, and underground mine access ways where mesh installation is impractical under unsupported ground.
| Application class | Fibre conformity | Placement specification | Performance test method |
|---|---|---|---|
| Dry-mix sprayed concrete | EN 14889-2:2006 | EN 14487-2:2006 | EN 14488-5:2006 |
| Wet-mix sprayed concrete | EN 14889-2:2006 | EN 14487-2:2006 | EN 14488-5:2006 |
| Cast-in-place slab | EN 14889-2:2006 | EN 206:2013+A2:2021 | EN 14651:2005+A1:2007 |
| Precast concrete unit | EN 14889-2:2006 | EN 13369:2018 | EN 14651:2005+A1:2007 |
For cast-in-place industrial concrete slabs and distribution-centre floors, MasterFiber 143 is generally introduced as a bulk fibre addition at the ready-mix batching plant, not at the job site. The fibre is added before the final water charge, allowing it to distribute through the mixer during early powder wetting; post-adding fibre to an already mixed truck at the site produces visible agglomerates and uneven fibre distribution under slump tests per EN 12350-2:2019. Slab mixes typically use a 0.45 to 0.55 water/cement ratio and a target slump of 120 mm to 160 mm for laser-screed placement. Specifiers commonly use a dosage of 3.0 kg/m³ to 5.0 kg/m³ when post-crack residual strength is required under ASTM C1609/C1609M-19 or EN 14651:2005+A1:2007. The industrial producer must verify that the fibre does not block the truck chute: polypropylene fibres can bridge across 50 mm chute gates at contents above 3 kg/m³, so many plants specify a minimum chute throat of 150 mm and avoid right-angle reducers. Finished products include jointless floor slabs, mezzanine decks, and distribution-centre hardstands where saw cuts are spaced at 6 m to 8 m and the fibre replaces welded wire mesh in crack-width control.
Cast-in-place secondary linings in bored road tunnels require a concrete that remains pumpable at water/cement ratios between 0.40 and 0.50 without segregating under high formwork pressure. MasterFiber 143 is added at 2.0 kg/m³ to 4.0 kg/m³ during batch production to improve early crack control and reduce surface bleed water before the lining reaches full design strength. A boom pump with a 125 mm nominal line is used for placement; the addition of polypropylene fibre increases the yield stress of the mortar fraction and often requires a slump adjustment of 10 mm to 20 mm to maintain the same pump output. Formwork pressure is monitored during the pour because the fibre-reinforced concrete can retain higher static pressure for a longer period before initial set, especially when placed at thicknesses above 400 mm. Compliance with EN 206:2013+A2:2021 and ASTM C94/C94M-21 governs the concrete specification, while fibre conformity is separately verified under EN 14889-2:2006. Published data for MasterFiber 143 in full-scale pumped secondary linings is limited; a site-specific pump trial is therefore required to establish the exact pressure–output relationship before production. Terminal products are cast tunnel linings, culverts, and retaining wall elements placed in 6 m to 12 m pours.
| Dosage range | Concrete system | Placement effect | End-use test standard |
|---|---|---|---|
| 2.0–4.0 kg/m³ | Cast secondary tunnel lining | Increased mortar-phase yield stress; pump trial required | EN 206:2013+A2:2021 |
| 3.0–5.0 kg/m³ | Industrial floor slab | Reduced saw-cut width opening; residual strength gain | ASTM C1609/C1609M-19 |
| 2.0–4.0 kg/m³ | Precast concrete unit | Improved green-body handling; reduced edge chipping | EN 14651:2005+A1:2007 |
| 4.0–7.0 kg/m³ | Sprayed concrete tunnel lining | Higher energy absorption class; greater rebound control | EN 14488-5:2006 |
Precast plants producing small cross-section units such as cable troughs, barrier segments, and retaining-wall blocks add MasterFiber 143 into pan mixers with a forced-action paddle and a discharge-gate sealing system that avoids fibre escape onto the weigh-hopper load cells. The common plant practice is 2.0 kg/m³ to 4.0 kg/m³ for improved green-body handling and reduced edge chipping during demoulding; the actual dosage is fixed by the declared performance under EN 14889-2:2006 and validated by a factory production control plan under EN 13369:2018. The critical equipment boundary is the skip hoist and overhead hopper gate: because synthetic fibres reduce the mass flow of dry fine sands through a 30° cone hopper, production lines may need pneumatic vibrators on the aggregate hopper walls when fibre dosing exceeds 2 kg/m³. Demoulding is conducted when the compressive strength reaches 12 MPa to 15 MPa for non-prestressed small units; premature demoulding below 10 MPa can produce fibre pull-out rather than tensile rupture at the cracked edge. Published plant data for demoulding strengths with MasterFiber 143 in this specific configuration are limited to manufacturer case studies; the range above reflects general precast concrete practice. Terminal products include interlocking retaining-wall elements, precast drainage channels, and utility vault covers with improved impact resistance.
High-alkali repair mortars and polymer-modified overlays present two fibre-related constraints during vertical overhead placement. First, MasterFiber 143 is a polypropylene-based fibre that must be checked against the cement system’s alkali content; EN 14889-2:2006 requires fibre durability in alkaline concrete, but the standard does not automatically qualify all repair-mortar formulations containing lithium-based setting accelerators or high-alkali aluminous cements. Second, the high surface area of polypropylene fibres raises the water demand of the mortar fraction; in a repair mortar with a maximum aggregate size of 2 mm and a water/cement ratio below 0.40, fibre additions above 1.0 kg/m³ can lower the initial flow of a thixotropic repair mortar by 20 % to 30 % on a flow-table test per EN 1015-3:1999. The placement process uses a low-speed paddle mixer at 300 rpm to 500 rpm, a wet-mix spray head, and a 5 mm airless spray nozzle. Fibre content is normally held to 0.5 kg/m³ to 1.0 kg/m³ when pumping through 25 mm internal-diameter hoses to avoid nozzle blockage at low flow rates. Terminal finished products are overhead tunnel repair patches, bridge-deck overlay repairs, and parking-structure spall repairs where the fibre reduces sag and improves crack-width control before resin or surface sealing is applied.
If a tunnel or underground parking structure is designed for a hydrocarbon fire load, MasterFiber 143 may be incorporated into cast concrete lining mixes primarily for passive fire-spalling protection. The mechanism is phase-change relief: polypropylene fibres melt between 160 °C and 175 °C, leave behind interconnected channels in the cement paste, and allow steam pressure to vent rather than delaminate the hot-face concrete. Fire-resistance testing is conducted under RWS, HC, or ISO 834-1:1999 temperature-time curves; the client-specific failure criterion is often no spalling depth greater than 5 mm after a 120 min hydrocarbon fire. The commonly specified dosage for this function is 2.0 kg/m³ to 3.0 kg/m³, but it is not a universal fibre content: published laboratory data show that spalling resistance depends on aggregate type, moisture state, and heating rate, so site-specific fire tests are required under EN 1363-1:2020. The cast lining installation uses internal poker vibrators and a minimum compaction time of 30 s per insertion; excessive vibration can cause fibre orientation towards the form face and produce a visible surface fuzz after formwork removal. Terminal products are cast tunnel linings, underground parking slabs, and transit-station walls where the fibre is part of a passive fire-resistance package, not a replacement for active ventilation or structural fire proofing.
Competitive MasterFiber 143 - Polypropylene Fiber for Reinforcement in Sprayed Concrete and Cast Concrete prices that fit your budget—flexible terms and customized quotes for every order.
For samples, pricing, or more information, please contact us at +8618112911328 or mail to sales1@liwei-chem.com.
We will respond to you as soon as possible.
Tel: +8618112911328
Email: sales1@liwei-chem.com
Flexible payment, competitive price, premium service - Inquire now!
A synthetic polypropylene fibre is supplied under the designation MasterFiber 143 for concrete applications in which plastic-shrinkage crack control, plastic-settlement reduction, and improved resistance to fire-induced spalling are required in sprayed concrete and cast-in-place concrete. The material is a hydrophobic monofilament with a density of approximately 0.91 g/cm³ and a melting point commonly reported between 160 °C and 170 °C. In normal-weight concrete, the addition rate is typically specified from 0.9 kg/m³ to 1.8 kg/m³, although fire spalling mitigation in high-strength concrete may justify dosages up to 2.0 kg/m³ when supported by fire test panels. The fibre is classified as a polymer microfibre under EN 14889-2:2006 and may be specified under ASTM C1116/C1116M where project documentation requires an American test framework.
MasterFiber 143 should not be specified as a replacement for structural steel reinforcement or for macro-synthetic fibres in applications requiring post-crack residual flexural strength. The low tensile modulus of polypropylene relative to steel and the small fibre cross-section limit its contribution to hardened-state load transfer. Its primary functions are plastic-state and high-temperature mechanisms: reducing the width of plastic shrinkage cracks in the first 24 h after initial set and creating pressure-relief pathways when the polymer melts during fire exposure. Field batching experience shows that addition sequence controls fibre distribution: the fibre is introduced after aggregate charging and before water to prevent clumping. In pan mixers and twin-shaft compulsory mixers, addition after water can produce fibre balls at shaft corners and inconsistent bag disintegration.
The addition-rate ceiling in pumped wet-mix shotcrete is set by paste volume, pump line pressure, and nozzle performance rather than fibre thermal stability. Concrete with water-to-binder ratios below 0.40 and slump below 150 mm may show a measurable increase in pump outlet pressure when MasterFiber 143 is added. Because the fibres raise the specific surface area of the granular phase, the plastic viscosity increases even though the fibre itself does not absorb mixing water. Production-scale monitoring on shotcrete lines with 50 mm to 65 mm internal-diameter delivery hoses indicates that dosages above 1.5 kg/m³ can require pump setting adjustments, especially in long vertical rise conditions. Published data for this exact product under every pump type are limited; trial spray panels should include a pressure transducer at the pump outlet to validate the selected dosage.
A relevant processing boundary is wet-mix piston pump intake. Monofilament fibres can bridge across the hopper screen, particularly when material is discharged too quickly into the hopper. Screens of 10 mm to 12 mm aperture are typical; blockages increase if the screen is already partially loaded with coarse aggregate. Maintenance logs from tunnel shotcrete crews indicate that hopper screens require inspection every 6 m³ to 8 m³ when running fibre-containing concrete, while unfibred mixes may run 12 m³ to 15 m³ between inspections. These are equipment-dependent figures, not a universal standard.
In dry-mix shotcrete, the limiting variable is fibre feed uniformity. MasterFiber 143 is pre-blended with cement and aggregate in a batch mixer; if the mix is discharged into a hopper and pneumatically conveyed, the fibre can segregate because of density differences. Fibre balls form when the material passes through a restriction or when the air conveying velocity is too low. The standard control is to maintain the air supply within the manufacturer’s recommended range for the gun and to use a vibrating screen feeder between the hopper and rotor. Nozzle blockage occurs when fibre clusters accumulate at the water ring; this failure mode is more frequent with lengths above 12 mm or when the water pressure is below the air pressure at the nozzle.
Comparative performance between MasterFiber 143 and other reinforcement systems is most clearly separated by modulus, dosage, and post-crack role. Steel fibres conforming to EN 14889-1:2006 have typical tensile strengths from 800 MPa to 1500 MPa and an elastic modulus around 200 GPa; they are selected where residual flexural and shear resistance are required after cracking. Macro-synthetic polymer fibres conforming to EN 14889-2:2006 class II may have tensile strengths from 300 MPa to 600 MPa and moduli from 5 GPa to 10 GPa; they are used where corrosion resistance and post-crack durability are required. MasterFiber 143 is a micro polypropylene fibre and is therefore specifiable only for plastic-state crack control and fire spalling mitigation. The table below establishes this boundary.
| Attribute | MasterFiber 143 micro polypropylene | Macro-synthetic polymer fibre | Steel fibre |
|---|---|---|---|
| Fibre type | Monofilament polypropylene | Structured or embossed macro polymer | Cold-drawn wire or loose steel fibre |
| Density | 0.91 g/cm³ | 0.92–0.95 g/cm³ | 7.85 g/cm³ |
| Tensile strength | 300–400 MPa | 300–600 MPa | 800–1500 MPa |
| Elastic modulus | 3.5–4.0 GPa | 5–10 GPa | 200 GPa |
| Typical dosage | 0.9–1.8 kg/m³ | 2–6 kg/m³ | 20–40 kg/m³ |
| Primary function | Plastic shrinkage crack reduction; fire spalling mitigation | Post-crack toughness; restrained shrinkage control | Post-crack flexural capacity; structural reinforcement |
| Corrosion risk in cracked concrete | None | None | Present unless passivated; chloride exposure accelerates corrosion |
| Standard reference | EN 14889-2:2006, ASTM C1116/C1116M | EN 14889-2:2006 | EN 14889-1:2006 |
When MasterFiber 143 is substituted for welded wire mesh in slabs-on-grade or sprayed concrete linings, the construction sequence may be shortened because the fibre is batched into the concrete rather than placed as fixed reinforcement. However, the fibre does not provide crack-width restraint after the plastic phase unless continuity and post-crack stress transfer are supplemented by structural steel or macro-fibre reinforcement. Long-term crack-width control in restrained members therefore requires a design check of the concrete section, degree of restraint, and reinforcement index, not a simple one-to-one substitution of mesh with micro polypropylene.
When concrete reaches compressive strengths above 60 MPa, the low permeability of the cementitious matrix impedes vapour transport during rapid heating. Fire exposure can produce internal pore pressures that exceed the tensile strength of the concrete, causing explosive spalling and exposing reinforcing steel. MasterFiber 143 is introduced for this scenario because its melting point near 160 °C is below the temperature at which spalling becomes critical. The molten and decomposed polymer creates a network of temporary channels that increases the effective permeability of the heated zone. Typical fire-spalling dosages are 1.5 kg/m³ to 2.0 kg/m³, but the required amount depends on concrete moisture content, silica fume dose, aggregate type, heating rate, and section depth. A reliable dosage determination requires fire test panels under ISO 834-1:1999 or an equivalent standard; published data for this product in every aggregate matrix are limited.
Fibre distribution is the primary field risk for fire spalling applications. The density of polypropylene is lower than that of cement paste, and the fibres can migrate toward the upper surface under prolonged vibration. In slabs of 200 mm to 300 mm thickness, consolidation should be limited to 5 s to 15 s per insertion point; excessive vibration can leave lower sections with insufficient fibre count. Core examination on trial placements may be used to determine the number of fibres per unit area on sawn surfaces. When fibre counts are visibly inconsistent, the fire protection cannot be assumed, even if the batch records show the correct dosage.
Another thermal limitation is that MasterFiber 143 should not be expected to improve post-fire residual strength. Once the fibres have melted and exited the matrix, the increased permeability remains as a system of micro-pathways, but the concrete surface may be weakened. After cooling, damaged cover must be assessed by chisel testing or core compressive strength per EN 13791 before repair decisions are made. The fibre is not a fireproofing agent; it is a spalling-control additive within a larger fire-resistance design.
For conformance control, the fibre should be received with a declared length, diameter, tensile strength, and melting range. The current technical data sheet for MasterFiber 143 should be compared with the project specification before batching. The dosage mass is usually based on concrete volume; the tolerance is commonly held to ±2% of the target fibre mass per batch when automatic dosing is used. Manual whole-bag addition is permitted when the bag mass is matched to the batch volume, but partial-bag addition should be avoided because it introduces dosage variability.
The table below provides a verification matrix for specification compliance.
| Verification objective | Test method or standard | Critical observation |
|---|---|---|
| Plastic shrinkage cracking | ASTM C1579-21 or equivalent | Dosage of 0.9–1.2 kg/m³ commonly reduces crack area in restrained slab specimens; project-specific confirmation required. |
| Fibre classification and tensile properties | EN 14889-2:2006 | Supplied as polymer microfibre; verify length, diameter, and tensile strength from current technical data sheet. |
| Fire spalling resistance | ISO 834-1:1999, RILEM TC 129-MHT | Melting point near 160 °C; dosage 1.5–2.0 kg/m³ for dense high-strength concrete; prequalification test recommended. |
| Sprayed concrete compressive strength | EN 14488-2 | Fibre should not be used as a strength modifier; strength depends on mix design and spray technique. |
| Residual flexural strength | EN 14488-3, EN 14651 | Not a primary criterion; micro polypropylene fibres do not provide significant post-crack residual capacity. |
| Alkali resistance | Manufacturer data in cement pore solution pH 12.5–13.5 | No corrosion mechanism; long-term durability governed by fibre distribution and matrix quality. |
For sprayed concrete, project specifications typically require that the fibre product be added without changing the water-to-binder ratio. The fibre itself is hydrophobic and does not absorb mixing water, but the increased solid surface area may reduce slump. Any added water or high-range water reducer must be rebalanced through trial mixes. The spray contractor should establish spray panels with the exact fibre dosage, accelerator type, and pump configuration before main placement. Sprayed concrete quality is then assessed by EN 14488-2 for compressive strength and EN 14488-6 for bond strength where relevant; the presence of MasterFiber 143 does not change the required sampling rate.
MasterFiber 143 is specified in cast-in-place applications such as industrial floor slabs, repair mortars, precast panels, and tunnel linings where restraint from adjacent construction or thermal shrinkage is expected. In such placements, the fibre is incorporated centrally at the plant or on site in the truck mixer. The common addition sequence is to charge the fibre with sand before coarse aggregate, add cement and supplementary cementitious materials, then introduce water and admixtures. In truck mixers, mixing speed should be maintained at the manufacturer’s rated mixing speed for at least 5 min after fibre introduction; discharge should not begin until visual inspection of a fresh sample confirms no fibre balls larger than 5 mm. If clumps are present, additional mixing time may be required, but prolonged high-speed mixing can increase air entrainment and should be limited.