| HS Code | 630155 |
| Material | Polypropylene |
| Fibertype | Monofilament polypropylene fiber |
| Fiberlength | 12 mm |
| Fiberdiameter | 34 µm |
| Aspectratio | 353 |
| Specificgravity | 0.91 |
| Tensilestrength | 350–400 MPa |
| Elasticmodulus | 3.5–4.0 GPa |
| Meltingpoint | 160–170 °C |
| Ignitionpoint | >400 °C |
| Waterabsorption | <0.1% |
| Alkaliresistance | Excellent |
| Acidresistance | Excellent |
| Thermalconductivity | Low |
| Electricalconductivity | Low |
| Recommendeddosageconcrete | 0.6 kg/m³ |
| Recommendeddosagegunite | 0.9 kg/m³ |
As an accredited SikaFiber 12-34 - Special Polypropylene Fiber for Concrete and Gunite factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.
| Packing | SikaFiber 12-34 comes in 600 g water-soluble bags, 20 bags per carton (12 kg total), for concrete and gunite. |
| Container Loading (20′ FCL) | 20′ FCL loaded with palletized SikaFiber 12-34 special polypropylene fiber bags, securely stowed for concrete and gunite applications. |
| Shipping | SikaFiber 12-34 is a non-hazardous polypropylene fiber for concrete and gunite. It is not classified as dangerous goods for DOT, ADR, IMDG, or IATA. Ship in original sealed, moisture-resistant packaging; keep dry and avoid punctures. No special transport labels or UN number required. Handle as general cargo. |
| Storage | Store SikaFiber 12-34 in its original, unopened packaging in a cool, dry, well-ventilated area. Keep bags tightly closed and protected from moisture, direct sunlight, extreme temperatures, and contamination. Avoid open flames and ignition sources. Stack securely to prevent bag damage. Observe good housekeeping and first-in, first-out stock rotation. Shelf life depends on storage conditions; consult the safety data sheet and supplier recommendations. |
| Shelf Life | Shelf life is 24 months from production date when stored dry, unopened, in original packaging, protected from moisture. |
In wet-mix shotcrete supplied to hard-rock tunnel headings, SikaFiber 12-34 is introduced at the batch plant rather than at the pump hopper. The fibre is dry-blended with cement and aggregate for 30–45 seconds before water and a polycarboxylate-based superplasticizer are added, producing a pumpable slurry with a slump of 180–220 mm at the pump inlet. Alkali-free accelerating admixtures are injected at the nozzle at a rate between 5% and 8% by weight of cementitious material, and the nozzle air pressure is held between 2.0 bar and 3.5 bar depending on line length. Production-scale pump observations indicate that fibre addition at 3.0 kg/m³ to 6.0 kg/m³ does not generate excessive backpressure when a vibrator grate is used at the receiving hopper; however, fibre balling occurs when the batch is discharged from low-wear free-fall truck mixers at mixing speeds above 14 rpm. Full-scale trials in 1.5 m³ paddle mixers with a static batch capacity of 0.5 m³ have been used to verify fibre dispersion, with a coefficient of variation below 8% by mass targeted across 10 consecutive samples. In-place material is sprayed in 50–80 mm lifts, with rebound losses of 10–15% commonly recorded on unmeshed substrates when the nozzle is held between 0.8 m and 1.2 m from the rock surface. The sprayed lining is tested under EN 14488-3 for flexural residual strength at crack mouth opening displacements of 0.5 mm and 2.0 mm, while ACI 506.4R-19 provides fibre-reinforced shotcrete design guidance and EN 14487-1 governs execution. The terminal product is a temporary or permanent rock support lining with a specified early-age compressive strength of 10–15 MPa at 6 hours and 28-day compressive strength above 30 MPa. The polypropylene fibre functions through pull-out friction after cracking rather than chemical bonding with cement hydration products; consequently, continuous steel bar reinforcement remains mandatory where bond stresses exceed 2.0 MPa or where rock movement is uneven. Overhead spraying in layers thicker than 80 mm per pass is normally avoided because the set time of alkali-free accelerator systems combined with the layer mass can induce sloughing before final set, irrespective of fibre type.
In dry-process gunite operations, SikaFiber 12-34 must be pre-blended with cement, sand, and any pozzolan before entering the feed hopper; nozzle injection of loose fibre creates severe segregation in the air stream. The dry-mix constituents are kept at 3–5% moisture content to suppress dust and prevent fibre clumping in the rotary feed bowl. Water is introduced through a perforated nozzle ring at a pressure between 2.5 bar and 3.5 bar, with the flow adjusted to maintain a water/cement ratio of approximately 0.35 at the point of impact. Layer thickness per pass is kept between 25 mm and 50 mm for vertical and overhead work, allowing each pass to densify before the next is applied. Rebound from dry-process gunite is higher than from wet-mix shotcrete, commonly in the range of 15–25%, and rebound particles are enriched in coarse aggregate and fibre; therefore, the in-place fibre content predicted from batching records must be corrected by destructive sampling under EN 14488-7 for fibre volume determination. The dry-gunite placement equipment is typically a rotary gun machine operating at air pressures of 200–300 kPa at the machine gauge, with hose lengths not exceeding 60 m to limit fibre impact velocity loss. Dosage for dry-process stabilisation work is generally specified from 1.8 kg/m³ to 3.0 kg/m³; levels above 3.0 kg/m³ require full-scale trial panels because the fibre can accumulate on the feed shoes of the rotary distributor and produce intermittent feed. The finished layer is cured under a spray-applied evaporation reducer or wet hessian for a minimum of 7 days, and the layer is accepted when rebound-adjusted in-place thickness meets the design tolerance of +20 mm/−10 mm.
Precast segmental liner production places a narrow processing window on fibre loading because demoulding and steam-curing creep interact with polypropylene fibre pull-out capacity. Tunnel segments, box culverts, and manhole bases are produced with a water/binder ratio between 0.32 and 0.38 and a slump class of S2–S3 according to EN 206. SikaFiber 12-34 is added at 2.0 kg/m³ to 5.0 kg/m³ to control early-age shrinkage cracking and edge damage during lifting. Addition above 4.0 kg/m³ reduces the mix slump by increasing the internal particle interaction, and compensating polycarboxylate ether dosage of 0.2–0.5% by weight of cement is often required to restore workability without changing the water/binder ratio. The fibre is charged into the pan mixer after coarse aggregate and before one-third of the mixing water, with a mixing sequence of 90 seconds after all additions to limit fibre surface fouling and maintain batch-to-batch uniformity. Accelerated curing at 50–70°C in insulated moulds is applied for 6–10 hours to reach demoulding compressive strength above 10 MPa, since the polypropylene fibre has no influence on hydration rate but can insulate and slightly retard surface temperature release. Mould release agents based on vegetable oil are preferred because solvent-based products can soften the fibre surface and produce visible edge fuzz on the cast surface. The terminal product is a segment with fibre content verified under EN 14889-2 class II conformity for structural synthetic fibres, and surface porosity is assessed visually under EN 13670 execution limits for the specified exposure class. Fibres do not replace the conventional reinforcement cage in segments where bursting stresses around the key or shield rams exceed 4.0 MPa, but they reduce spalling at the longitudinal joint edges during assembly.
| Application stage | Test method designation | Recorded parameter | Purpose in downstream specification |
|---|---|---|---|
| Wet-mix sprayed concrete | EN 14488-3 | Flexural residual strength at 0.5 mm and 2.0 mm crack mouth opening displacement | Verify post-crack load-bearing capacity in temporary support linings |
| Precast segmental liners | EN 14889-2 class II | Fibre geometry, alkali resistance, tensile strength | Confirm polymer fibre conformity for structural use |
| Ground-supported industrial slabs | ASTM C1609/C1609M | Residual strength at L/600 and L/150 net deflection | Evaluate substitution ratio against a steel-fibre reference slab |
| Concrete overlays and repair mortars | ASTM C1579-21 | Average crack width and total crack length | Compare early-age cracking potential of restrained overlays |
Where bonded concrete overlays on bridge decks are specified, the use of SikaFiber 12-34 alters the restrained shrinkage stress profile. Low-shrinkage overlay mixes are proportioned with a water/binder ratio between 0.36 and 0.42, a blended cement content of 400–450 kg/m³, and a maximum aggregate size of 8 mm to permit placement thickness down to 25 mm. The substrate is prepared to a concrete surface profile of CSP 5–CSP 8 in accordance with ICRI Guideline 310.2R, then saturated surface-dry and primed with a low-viscosity epoxy or cementitious bonding slurry. Fibre dosage in overlays is typically 3.0 kg/m³ to 5.0 kg/m³, and the fibre is dispensed through the aggregate belt rather than dumped into the final mixing water to avoid clumping. Placement is carried out by a low-velocity wet-spray lance or by hand strike-off, with a finishing window of 30–60 minutes at 20°C before the surface becomes unworkable. The restrained shrinkage performance is screened under ASTM C1579-21, where total crack length and average crack width are recorded for plain and fibre-modified panels; published data for this specific configuration is limited, but accepted practice uses the method to rank mixes rather than to predict absolute field cracking. The finished overlay is moist-cured for 7 days or sealed with a curing compound compliant with ASTM C309. Polypropylene fibre does not reduce the ingress of chlorides or extend the service life in a chloride-exposed deck unless the matrix itself is densified with silica fume or metakaolin, so the exposure class under EN 206 must still be achieved by mass transfer resistance rather than fibre addition.
Ground-supported slab mixes are particularly sensitive to fibre addition timing because the material is typically conveyed by truck mixer, pumped through a boom, and struck with a laser screed. For industrial floors and hard standings, SikaFiber 12-34 is introduced at 3.0 kg/m³ to 6.0 kg/m³ as a partial or full alternative to steel fibres, with the design residual strength evaluated under ASTM C1609/C1609M at net deflections of L/600 and L/150. A 0.45 water/binder ratio and a 20 mm maximum coarse aggregate size are common, and the air content is held below 3% to limit strength loss. The mix is pumped through a boom with a 125 mm internal diameter delivery line, and the pump pressure is normally 5 MPa or less; synthetic fibre does not cause the same pump wear or line blockages as hooked-end steel fibre, but it can float to the slab surface if the screed is over-vibrated. Saw cutting is performed when the early-age tensile stress exceeds early-age tensile strength, typically between 6 hours and 12 hours at 20°C, and joint spacing is set between 4.5 m and 7.5 m depending on slab thickness and drying shrinkage. The synthetic fibre does not provide the same post-crack residual strength at large crack widths as steel fibre; therefore, partial substitution is typically limited to slabs with design negative moment demands below 15 kN·m/m or where crack control at service load is the primary performance requirement. The terminal product is a floor slab with a trowelled finish and a specified flatness of FF 25–35 under ASTM E1155, with the final surface inspected for fibre fuzz and repaired by light sanding or a thin polymer-modified skim coat where exposed fibres exceed 1.0 mm in height.
Although canal and reservoir linings are not primary structural applications, polypropylene fibre at elevated dosage reduces surface craze cracking under hot-weather placing conditions. Canal panels are often slipformed in longitudinal passes with a width of 2.0–4.0 m and a thickness of 75–125 mm, using a low-slump mix with a water/binder ratio below 0.45. SikaFiber 12-34 is dosed at 0.9 kg/m³ to 1.8 kg/m³ when only plastic shrinkage control is required, but higher dosages up to 3.0 kg/m³ are used where panels are subject to wave-driven scour or thermal cyclic movement. The fibre is added to the concrete truck at the plant and mixed for 10 minutes at mixing speed, then the slump is adjusted with a mid-range water reducer to maintain 40–60 mm for slipform stability. Curing is critical because rapid evaporation on the exposed canal slope can generate early-age cracking before the fibre is fully engaged; therefore, a spray-applied white-pigmented curing membrane is applied within 15 minutes of finishing. Joints are formed at intervals of 3.0–6.0 m and sealed with a polyurethane sealant meeting ASTM C920. The finished product is a watertight lining with a maximum allowable crack width of 0.2 mm under service conditions and a minimum compressive strength of 25 MPa at 28 days. The fibre itself does not provide primary watertightness, and the use of a waterstops at construction joints remains mandatory where hydrostatic head exceeds 1.5 m.
Steep-slope erosion control layers are placed with dry-process equipment using air pressures between 200 kPa and 300 kPa at the machine and a water ring at the nozzle that delivers a target water/binder ratio of 0.35. The mix is composed of one part cement to 3.5–4.0 parts clean sand by volume, with SikaFiber 12-34 added at 3.0 kg/m³ to 6.0 kg/m³ to improve green strength and reduce sloughing on slopes steeper than 45°. The fibre is pre-mixed with the dry materials in a horizontal shaft mixer for 2 minutes to break up fibre bundles before the material is transferred to the gunite machine. Placement is performed in 50–75 mm layers, and the nozzle is held at 0.6–0.9 m from the slope surface to keep rebound below 20%. Where the slope exceeds 60° or where the erosion control liner is applied over a soil-nail grid, the first layer is allowed to gain initial set before the second layer is applied; the initial set time is verified by ASTM C403 penetration resistance, with a value of 500 psi typically used as the threshold for re-entry. The finished surface is left with a coarse gunite texture that serves as a mechanical key for a subsequent hydroseeding layer, and the impact of fibre content on surface runoff is checked by measuring the permeability of the cured layer under a falling-head test. The terminal product is a 100–150 mm thick erosion-resistant facing that must pass a bond test under ASTM C1583 with a minimum in-place tensile pull-off strength of 0.7 MPa on the parent soil or rock. Polypropylene fibre does not protect against frost-induced spalling if the facing is saturated and subjected to freeze-thaw cycles, so the mix is air-entrained to 4–6% for slopes in cold climates in accordance with EN 206 exposure class XF3.
Self-compacting concrete for precast architectural cladding presents a severe test of fibre suspension because the mix must flow through congested reinforcement without segregation while maintaining a defect-free exposed face. SikaFiber 12-34 is introduced at 1.0 kg/m³ to 2.0 kg/m³ only when the fibre is 12 mm long or less, because longer fibres reduce passing ability and can bridge the gaps between vertical reinforcement bars. The concrete is proportioned with a water/powder ratio below 0.35, a powder content above 550 kg/m³, and a viscosity-modifying admixture to keep the fibre uniformly dispersed during the flow period. Slump-flow is maintained between 650 mm and 750 mm under ASTM C1611/C1611M, and the T500 time is kept between 2.5 seconds and 5.0 seconds. The mix is placed from a fixed discharge point into a vertical mould, and vibration is not permitted because it would cause the polypropylene fibre to orient horizontally at the form face and produce visible subsurface fibre patterns after demoulding. The element is demoulded after 16–24 hours, and the surface is inspected under raking light for fibre protrusion; protruding fibres are removed by hot air gun followed by light abrasive dressing. The compliance path is through EN 14889-2 class II for fibre specification and EN 13670 for execution tolerance, while the architectural colour and texture are controlled by using a consistent cement source and a non-staining release agent. The terminal product is a thin-wall cladding unit with a specified face flatness of ±3 mm over 2.0 m and a minimum pull-off resistance of 1.0 MPa between the fibre-containing concrete and the backing connection.
Competitive SikaFiber 12-34 - Special Polypropylene Fiber for Concrete and Gunite prices that fit your budget—flexible terms and customized quotes for every order.
For samples, pricing, or more information, please contact us at +8618112911328 or mail to sales1@liwei-chem.com.
We will respond to you as soon as possible.
Tel: +8618112911328
Email: sales1@liwei-chem.com
Flexible payment, competitive price, premium service - Inquire now!
In cementitious placements where plastic shrinkage is the dominant early-age cracking mechanism, a synthetic microfibre addition is specified because the fibre count per cubic metre controls early crack propagation. SikaFiber 12-34 functions in that role as a virgin homopolymer polypropylene microfibre with a nominal length of 12 mm and an equivalent filament diameter of 34 μm. Under ASTM C1116/C1116M the material falls within Type III synthetic fibre-reinforced concrete, and under EN 14889-2:2006 it is supplied as a Class I polymer fibre for non-structural crack control in concrete, mortar and sprayed concrete. The product is batched at 0.9 kg/m³ to 1.8 kg/m³ in conventional ready-mix concrete; the lower portion of that range is typical for interior slabs with controlled evaporation, while the upper portion is used in dry-mix gunite, exposed slabs under high wind, and placements where finishing operations are delayed. Addition is made through the aggregate weigh hopper, a fibre dispenser, or directly into the truck mixer. The fibre is not a replacement for structural reinforcement governed by ACI 318 or EN 1992-1-1, and it is not intended to provide post-crack flexural capacity in a cracked section.
The physical geometry creates a length-to-diameter ratio of approximately 353. At 0.9 kg/m³ the nominal filament count is approximately 9.1 × 10⁷ fibres/m³, based on a specific gravity of 0.91 g/cm³ and the 12 mm length; at 1.8 kg/m³ the count approximately doubles. Because the fibre is hydrophobic, it does not absorb mixing water or influence the chemical water demand of the cement. Its melting point is near 160 °C, so sustained exposure to temperatures above this value is outside the operating envelope.
In wet-mix shotcrete, the addition limit is set by pumpability and nozzle performance rather than by fibre dispersion alone. The fibre is generally added to the ready-mix truck at the plant, and the mixer is operated within the drum rotation and mixing duration requirements of ASTM C94/C94M. For a dosage above 1.2 kg/m³, the plant should verify uniform fibre distribution by discharging a small sample after the target mixing revolutions and observing the fibre count across the sample surface. A worn drum or an over-loaded truck can produce fibre accumulation behind the mixing blades, which is then released irregularly into the shotcrete pump.
During pump evaluation, a trial load should be checked with ASTM C143/C143M slump and ASTM C231/C231M air content before the placement begins. If slump drops below 40 mm in a wet-mix shotcrete mixture, the reduction is normally corrected by adjusting high-range water reducer, not by adding water, to avoid exceeding the maximum water-to-cementitious-materials ratio specified for the exposure class. Polycarboxylate-based high-range water reducers can alter the fresh-state yield stress of fibre-mortar interfaces differently than lignosulfonate-based admixtures, and the admixture type should therefore remain unchanged between trial and production batches.
At the pump, a rotary-cylinder concrete pump with an S-valve or ball-valve hopper is preferred over a piston type without remixing agitation when fibre dosage exceeds 1.0 kg/m³. Production-scale startup failures are most commonly linked to fibre clumps at the hopper grate or to a blocked reducer placed too close to the pump outlet. A 50 mm to 65 mm discharge hose is typical for wet-mix shotcrete, and the hose length should be kept below 60 m unless the pump pressure is verified by trial. Because no universal pressure-drop curve is published for this particular fibre, the pump stroke rate and surge pressure must be recorded during a pre-construction field trial. Observing a steady wet-mix spray without nozzle spitting or whipping provides operational verification that the fibre is wetted out and uniformly suspended in the paste.
For dry-process gunite, the fibre is not carried through a concrete pump. The material is metered as a dry constituent with cement and aggregate in a rotary gun or double-chamber gun. The output stream is hydrated only at the nozzle, so the fibre has a very short travel time through the water ring. This places greater importance on the aggregate moisture condition prior to batching. In production, aggregate moisture is held between 3% and 6% to control dust and prevent fibre balling in the dry feed. If the sand is saturated above 6%, the fibre tends to adhere to the aggregate surface and can form tufts that briefly interrupt the feed wheel. The use of a pre-wetting spray over the aggregate stockpile is therefore adjusted to avoid free surface moisture on the sand fraction.
The fibre is supplied in a form that can be added without opening individual filament bundles; in bulk handling, a pneumatic dispenser or gravity feeder is used. The polymer does not corrode, is insoluble in water, and is resistant to the alkaline environment of hydrating cement with pH above 12.5. Storage should be in dry conditions at ambient temperatures below 45 °C, away from ultraviolet exposure and organic solvents. The packaging should be protected from puncture and kept closed to prevent contamination with oil or diesel from mixer equipment, as surface contamination can reduce fibre dispersion. A certificate of conformity referencing EN 14889-2:2006 and ASTM C1116/C1116M should be retained with the batch delivery.
The fibre form is monofilament rather than fibrillated. This is significant in gunite because fibrillated yarn-type fibres can expand into networks during high-shear mixing and occasionally obstruct the water ring or nozzle tip. A discrete 34 μm monofilament remains as an individual filament and is less likely to form mats. In a standard rotating drum mixer, the material disperses through the mortar fraction rather than wrapping around mixer paddles. For high-dosage placements, pre-blending with the coarse aggregate before the cement is introduced reduces the formation of fibre nests at the batch plant.
In dry-mix gunite, rebound is the mass of material that strikes the substrate and falls away before hydration is complete. Increasing air pressure to reduce rebound is not free; the nozzle operator must maintain a consistent nozzle angle of 80° to 90° to the substrate for effective compaction. The presence of SikaFiber 12-34 in the dry mix changes the in-flight particle distribution slightly because the low mass of the polypropylene filament reduces its kinetic energy compared with aggregate. Field adjustment should start with air pressure in the 240 kPa to 415 kPa range, depending on the gun type and hose length, and then be tuned to the minimum air pressure that produces a tight, non-springing surface. Because the product is intended for plastic shrinkage control, not structural toughness, spray trials are designed to confirm crack resistance rather than flexural residual strength.
The separation is primarily one of fibre count, function, and dosage. Steel fibres complying with ASTM A820/A820M and macro-synthetic fibres complying with EN 14889-2:2006 Class II are used for post-crack residual strength. The dosages are higher, and they alter mixing behaviour more severely. SikaFiber 12-34 at 0.9 kg/m³ to 1.8 kg/m³ is designed for plastic shrinkage crack control and finishability in slabs and gunite. It does not replace structural reinforcement and should not be specified where a design requires ASTM C1609/C1609M residual strength or EN 14651 limit of proportionality.
| Parameter | SikaFiber 12-34 | Macro-synthetic fibre | Steel fibre |
|---|---|---|---|
| Classification | ASTM C1116/C1116M Type III; EN 14889-2 Class I | EN 14889-2 Class II | ASTM A820/A820M |
| Typical length | 12 mm | 38 mm to 65 mm | 30 mm to 60 mm |
| Diameter or equivalent diameter | 34 μm | 0.3 mm to 1.0 mm | 0.5 mm to 1.0 mm |
| Density | 0.91 g/cm³ | 0.90 g/cm³ to 0.95 g/cm³ | 7.85 g/cm³ |
| Typical dosage | 0.9 kg/m³ to 1.8 kg/m³ | 3 kg/m³ to 9 kg/m³ | 20 kg/m³ to 50 kg/m³ |
| Primary function | Plastic shrinkage crack control | Post-crack flexural control | Post-crack flexural control |
A direct substitution of SikaFiber 12-34 for steel fibre in ground-supported slabs on pile caps or in structural shotcrete linings is not valid. If the design document references ASTM C1609/C1609M or EN 14651 as the acceptance criterion, the project requires a macrofiber or steel fibre system with a demonstrated post-crack residual strength class. The microfibre product instead provides control of early-age cracking during the first 24 h after placement, and the relevant acceptance test is a plastic shrinkage cracking method such as ASTM C1581/C1581M or a project-specific slab exposure panel.
Quality verification begins with a trial batch under production mixer conditions. The fibre addition point is recorded and held constant for all loads. A minimum of 4 loads per mix design is evaluated for slump, air content, and wet density. Plastic shrinkage crack control is evaluated using ASTM C1581/C1581M or by a comparative slab exposure under controlled wind and temperature. If crack width exceeds 0.3 mm in the trial slab, the dosage is increased within the 0.9 kg/m³ to 1.8 kg/m³ range before other mix changes are made. The fibre itself is not a substitute for proper curing. Curing with membranes, water, or wet burlap should begin immediately after finishing and be maintained for at least 7 days when the cementitious system is based on ordinary portland cement. Curing delay is a known cause of early-age cracking that no synthetic fibre can offset.
Batch-to-batch variance is monitored by a fresh-state visual count or washout sample on a trial load. In gunite, core samples are not used for fibre count verification because the fibre is too small to be counted reliably in hardened material at production frequencies; instead, the nozzle trial and plastic shrinkage panel become the acceptance record. All test results are compared with the mix design tolerance for water-to-cementitious-materials ratio and with the specified air content for the exposure class.